Agenda for meeting Tuesday, 11 April 2000 at 4pm EDT.

Date: 11 April 2000

Time: 4:00 pm EDT (2:00 pm Socorro, 3:00 pm Tucson)

Phone: (804)296-7082 (CV SoundStation Premier Conference phone).

Past minutes, etc on MMA Imaging and Calibration Division Page

Minutes

--------

News - Wootten

News from the ACC, the DH meeting, and the 10 April ASAC meeting.

Project book updates on track--ALMA by 21 April.

Chapter 2 can be read, and a preliminary version of Chapter 3 (not yet) as well as Min's revision of Chapter 15.

We need to turn in a March report by 12 April--here is what I have--comments?

Calibration and Imaging Division Monthly Report for March 2000.

Activities in March included preparation for and attendance at the first ALMA Science Advisory Committee (ASAC) meeting in Leiden March 10-11. The ASAC reaffirmed their support of the project and issued a 45 page report containing advice to the project on various matters. Yun chaired a Conceptual Design Review of the ALMA Configuration, held in Tucson 20-21 March, at which plans were laid out to reach a Design Review in the early fall of 2000. Butler presented site data at the Configuration review, and prepared a new digital mask, incorporating changes suggested at the review, for configuration siting work. He also compared Chajnantor and Pampa la Bola phase stability data, and worked further on water vapor radiometry. Radford organized a Site Characterization Review was held in Tucson on 22 March to review progress and to identify priorities for testing in the coming year, which emphasize reaching understanding of the water vapor content above Chajnantor, especially at 183 GHz. He continued development of the nutating secondary plan for the prototype antennas. Mangum worked on Prototype Interferometer Evaluation Plan (PIEP), the ALMA Pointing Model, and calibration schemes for ALMA.

--------

Configurations - Yun

Tucson meeting review. A simulation process was agreed to, to evaluate imaging properties of the various arrays. Min has received only a few images so far. Al will try to get FITS image of Mundy's protoplanetary disk. Telephone meeting: 20 April at 11 am EDT is planned in the conference room.

----------------------------------------------------------------------

ASAC - Wootten

The FINAL ASAC report is available.

--------

FY2000-2001 Budget

As you may recall, it was decided to go with a two year budget, since the FY2001 one was too small to survive on. We need to know about items we will need to purchase ASAP. So far I have input on Site Characterization only.

--------

Calibration - Mangum

Jeff wrote a calibration memo which we will discuss.

----------------------------------------------------------------------

Action Items 11Apr2000

DECISION: Configurations--where are we? April meeting plans...

DECISION: Implementation of 183 GHz WVR?

DECISION: Is a nutating secondary necessary?

DECISION: What is the total power specification on the ALMA?

DECISION: What is the effect of 1/f noise in the HEMT amplifiers of SIS receivers upon our ability to combine total power and interferometric images into a faithful representation of the sky?

Year 2000

January February March April
May June July August
September October November December


January, 2000

Jan, 20-21 Correlator PDR Charlottesville, USA
Jan, 31 Division Heads/Team Managers Meeting Teleconference


February, 2000

Feb, 3 Euro-SAC Meeting Teleconference
Feb, 14 ALMA SAC Meeting Teleconference
Feb, 16 ALMA Liaison Group Meeting Tokyo, Japan
Feb, 17-19 ALMA Technical Meeting Tokyo, Japan
Feb, 23 Configuration WG Teleconference
Feb, 28-29 ALMA Systems Review Garching, Germany


March, 2000

Mar, 2 Euro-SAC Meeting Teleconference
Mar, 6 Software Working Meeting Garching, Germany
Mar, 8 Photonics Coordination Meeting Schipol, Amsterdam
Mar, 9 ALMA Liaison Group Meeting Amsterdam, NL
Mar, 10-11 ALMA SAC Meeting Leiden, NL
Mar, 20-21 Receiver Conceptual Design Review Charlottesville, USA
Mar, 20-21 Array Configuration Review Tucson, USA
Mar, 27-31 SPIE Meeting: Astronomical Telescopes and Instrumentation 2000 Munich, Germany


April, 2000

Apr, 3 ECC Meeting Garching, Germany
Apr, 6 Euro-SAC Meeting Teleconference
Apr, 7 ACC Meeting Washington DC, USA
Apr, 10 ALMA SAC Meeting Teleconference
Apr, 27-28 Science Software Requirements (SSR) Meeting Paris, France


May, 2000

May, 1-2 Site Development Discussions Garching, Germany
May 15-17 Test Interferometer Planning Tucson, Arizona


June, 2000

Jun, 12-16 2nd IRAM Millimeter Interferometry Summer School IRAM Grenoble, France
June 19-20 Vertex Antenna PDR Duisburg, Germany
Jun, 20-27 7th Synthesis Imaging Summer School Socorro, USA
June 21-22 EIE Antenna PDR Venice, Italy


July, 2000
August, 2000
September, 2000
October, 2000

October 13 ACC Meeting Paris, France


November, 2000
December, 2000