MMA Imaging and Calibration Group
Agenda/Minutes for meeting Tuesday, 26 August 2003 at 4:00 pm EDT.
Date: 26 August 2003
Time: 4:00
pm EDT (2:00 pm Socorro, 1:00 pm Tucson)
Phone: (434)296-7082 (CV SoundStation Premier Conference phone 3rd
floor). No Video planned...
Past minutes, etc on MMA
Imaging and Calibration Division Page
Agenda
Notes from the meeting are in this font!
--------
Science IPT Items - Wootten
ALMA Calendar
- 25 August ANASAC face-to-face meeting, Chicago O'Hare
- 1 Sep--ESAC face-to-face meeting, Madrid
- 5-6 September ASAC Meeting Hamilton, Ontario, Canada Charges
- 17-20 September, Richmond. Mini-ALMA
Week.
- ?? October Correlator CDR
- 13 October AMAC Meeting proposed, Europe Dwingeloo
- 3-4 November ALMA Board, Santiago
- 6 November ALMA Groundbreaking
- NA Science IPT Bimonthly Report to
the NSF. Comments, corrections, additions please!
News - (Wootten)
ANASAC Meeting
Front End Upgrade
Path
Configuration Movie
Progress...I count about 90
proposals. I'm slowly going over them for sanity checks...Ewine
and her student Jens have done a marvelous job of organizing them.
Discussion Item - (Wootten)
Calibration. Calibration
(Butler)
- Calibration
plan and milestones (Bryan)
What people writing which section for what date.
Telecon last week
No further tests of amplitude devices??
Accuracy of saturation measurements. Effland asked:
Tony Kerr and I have been measuring
the saturation from room temperature loads of Band 6
mixer-preamps. We're trying to determine
if this measurement will be required for each mixer-preamp in
the array. Do you have any idea how accurately saturation must be
measured?
Response: The current calibration goal is 1%. I think the ASAC
will set the specification somewhat looser, perhaps 3% Band 6, as we
don't see how we can reach 1%. I'm not sure what the saturation
will be but as I recall something like 3%. To have measured
something at all, it should be
5 sigma, so I would think that a 10% measurement would be good.
That then would amount to 10% of our specification and a third of our
goal. Of course, I should know from the FE Group what is possible
also! What does the group think?
ALMA Receiver stability
A further telecon may be planned for 1430 UT on 27
August.
Science IPT activities (Wootten )
- Science Requirement document (Butler)
- ALMA Science Requirements document under construction
provides a succinct flowdown from the Project Plan; Preface to
Engineering Requirements document nearing completion.
- Configuration (Wootten)
- Extended Array (Holdaway) Document
ALMA-90.02.00.00-002-A-SPE submitted.
Comments?
- Move Sequence
(Conway) Note that the four TP antennas cause some problems in
defining the resequencing. One solution is to assume that they
will be assimilated into the ACA. Ewine and I recommended doing
that for now.
- ATF (Mangum) Alcatel unveiled!!
- Site characterization (Radford)
- Public Relations. Movie delayed for revealing ALMA
secrets...
Upcoming Meetings - Wootten
SEP 22-26, 2003 4th
Cologne-Bonn-Zermatt-Symposium on The Dense Interstellar Medium in
Galaxies
--------
Travel
Oh, always
------