No. Title Dueordone date Level Status/oldate 98705 Report on phase correction analysis 2004-Jul-31 3 Late2003-Jul-31 Cancel 98707 Report on accuracy of atmo models 2004-Jul-30 3 Done 2003-Jul-31 98701 Complete draft ICD between Science Site 2004-Nov-30 3 On track 9818 ICD between Science and Site Approved 2004-Nov-30 2 Draft2004-Jan-31 98221 Draft of Design Reference Mission 2003-Oct-24 3 Done2003-Oct-15 9820 Calibration strategy submitted 2004-Feb-15 2 Done2003-Sep-30 9822 Design Reference Mission Submitted 2003-Dec-10 3 Done2003-Dec-31 98210 Draft of operation model for calib 2004-Mar-15 3 Done2003-Mar-30 98214 Revised antenna location determination 2004-Sep-03 3 Done2003-Jun-30 98451 Comm Science verification plan drafted 2004-Mar-03 3 Done2003-Dec-31 98706 Report on height of turbulent layer 2004-Mar-31 3 Late2003-Dec-31 Work 75% done 98301 Draft plan for Early Science config 2004-Feb-29 3 Done2004-Feb-29 98353 Draft WVR software implementation plan 2004-Jul-1 3 Done2004-Mar-30 ALMA Memos 495, 496.1 98432 Plan for interferometry tests on ATF 2004-Jul-31 3 Late2004-Mar-31 Work 75% done 9825 Science aspects of operations plan 2004-Jul-31 2 Done2003-Dec-31 9830 Plan for early science configurations 2004-Jun-30 2 Done2004-Jun-30 98401 Prototype antenna motion tests complete 2004-Jun-30 3 Done2004-Jun-30 98402 Report on prototype antenna pointing in varying wind conditions 2004-Jun-30 3 Done2004-Jun-30 98452 Science verification draft for commissioning revised 2004-Jun-30 3 Done2004-Jun-30 9835 Report WVR strategy / implementation / operations 2004-Dec-06 2 2004-Sep-30 (In WVR SoW as 2004-Dec-06) 9840 Review of tests of calibration strategies on prototype interferometer complete 2005-Dec-31 2 2004-Dec-31 DelayCant occur until the beast exists