Summary from C. Haupt Dec 31 2006 Task 1 AEM: - TICRA will investigate the effect of the qudripod leg cladding on the beam pattern VERTEX - Drawings were provided to TICRA - Details on the quadripod leg cladding needs to be included in model Both antenna - Goretex membrane need to be included in model Front End: - Model not complete. Some detailed information are missing, but should be available by mid of Jan. Task 2 (all calculations were done without front end optics) - Effect on reflector panels on beam pattern was analysed - Rounded Edge: Work will continue on different edge geometries, also considering manufacturing aspects. - Subreflector tilt: Most of the analysis was made existing design and tilt angels were verified - Scattering Cone: Design of Richard Hills was verified - Nutation: Ticra should repeat the nutation calculation for another nutation centre located 100mm below the prime focal point. Up to 1 deg nutation is sufficient. Task 3 - To be done