In the document approval request area of almaedm, there are several documents relating to the ALMA configuration: 74. ALMA-90.02.00.00-002-A-SPE Long Baseline (Y+) Array Configuration: Specifications and Requirements Holdaway 2003-11-04 11:02 (2) 109. ALMA-90.02.00.00-003-A.SPE Array Reconfiguration Sequence Conway 2003-11-14 03:00 68. ALMA-37.01.00.00-001-A-SPE System Requirements for the ALMA Antenna Transporter System M. Kraus / E. Pangole Date Decision Required: 2004-02-17 10:00 Neither of the first two have had any comment at all, presumably owing to the brilliance of their conception. John has provided comments on the last at my request. Since the Operations Group has devised a Plan, and since the transporter document makes recommendations on specific move sequence timing, there have been some discussions on this. Please read the comments on document 68 at: http://tinyurl.com/yrfop One favored sequence John proposed: ==================John 2b mod of Mark 2==================================== STRAWMAN SEQUENCES Modified Straw Man Reconfiguration Plan 2b: sit in inner, from inner to outer, sit in outer, and back in; Antenna move sequence M-X-X-M-X (M is a day when transporters are used for antenna moves - give an average of 4 ant moves every 2.5 days) compact array: sit for 3 weeks 21 days Marching out to Y11: 37 moves of 4 ants 93 days Y11 array sit for 3 weeks 21 days Marching in: 39 moves of 4ants 105 days to compact plus 1 week (include one week stopped in 6-I) Sub Total 240 days Extra 15 days stopped, added 15 days to compact, extended or intermediate arrays ('Contingency') Grand total 255 days Exactly 9 months, so cycle repeats every 3 years, phase to avoid bad Tau in compact I like this reconfiguration plan best, there is sufficent margin for adapting the array. How the 15 extra days are used could be varied. =================================================================== We solicit comment.