31 98703 9.380.98703 Radio sonde data analysis written. 2003-Nov-30 4 Demote. Draft exists by Butler but languishes. 32 98705 9.380.98705 Report on phase correction analysis 2004-Jul-31 3 Delay; Roberto Rivera is working on this. He will produce a report by the end of July. 33 98707 9.380.98707 Report: accuracy of mesoscale atm model 2003-Jan-30 4 Done The contract with Andre Erasmus was about the feasibility of forecasting PWV at Chajnantor from satellite images. It was completed in January 2003. The final report is at (http://www.eso.org/gen-fac/pubs/astclim/espas/radioseeing/pdf/ALMAFnlRep_Erasmus_Dec2002.pdf) 34 98701 9.380.98701 Complete draft ICD between Science and S2003-Nov-30 3 Done 35 9818 9.380.9818 ICD between Science and Site Approved 2004-Apr-30 2 Process 36 98221 9.380.98221 Draft of Design Reference Mission 2003-Oct-24 3 Done 37 9820 9.380.9820 Calibration strategy submitted 2004-Feb-15 2 Done 38 9822 9.380.9822 Design Reference Mission Submitted for a2003-Dec-15 3 Done 39 98210 9.380.98210 Draft of operation model for calibration2004-Mar-15 3 Done 40 98214 9.380.98214 Revised antenna location determination p2004-Jun-15 3 Delay 41 98451 9.380.98451 Science verification plan for commissio2004-Mar-03 3 Done 42 98706 9.380.98706 Report on height of turbulent layer 2004-Jun-30 3 Delay; Juan Pablo presently writing up a memo on the determination of the height of the turbulent layer estimated from radiometer observations. Deadline end of June, but it may be further delayed. 43 98704 9.380.98704 Report on analysis of high precision hyg2004-Jan-31 3 Delete 44 98301 9.380.98301 Draft plan for Early Science configurat2004-Feb-29 3 Done 45 98353 9.380.98353 Draft WVR software implementation plan 2004-Mar-30 3 Done ALMA Memo 496 46 98432 9.380.98432 Plan for interferometry tests on ATF complete 2004-Jul-31 3 Delay 47 9825 9.380.9825 Science aspects of operations plan complete 2004-Jun-30 2 48 9830 9.380.9830 Plan for early science configurations complete 2004-Jun-30 2 Done