37 9820 9.380.9820 Calibration strategy submitted 2004-Feb-15 2 Delay 34 98701 9.380.98701 Complete draft ICD between Science and Site 2003-Nov-30 3 Done 31 98703 9.380.98703 Radio sonde data analysis written. 2004-Feb-28 4 Delay 38 9822 9.380.9822 Design Reference Mission Submitted for approval 2003-Dec-10 3 Done 39 98210 9.380.98210 Draft of operation model for calibration 2004-Mar-31 3 Delay 40 98214 9.380.98214 Revised antenna location determination plan 2004-Feb-28 3 Delay 41 98451 9.380.98451 Science verification plan for commissioning draf2004-Feb-28 3 Delay 42 98706 9.380.98706 Report on height of turbulent layer 2004-May-31 4 Delay 35 9818 9.380.9818 ICD between Science and Site Approved 2004-Jan-31 2 Submitted 43 98704 9.380.98704 Report on analysis of high precision hygrometer 2004-Mar-31 4 Delay 32 98705 9.380.98705 Report on phase correction analysis 2004-Jan-31 4 Delay 33 98707 9.380.98707 Report on accuracy of mesoscale atmosphere model2004-Jun-30 4 Delay 44 98301 9.380.98301 Draft plan for Early Science configurations 2004-Feb-29 3 45 98353 9.380.98353 Draft WVR software implementation plan 2004-Mar-30 3 46 98432 9.380.98432 Plan for interferometry tests on ATF complete 2004-Mar-31 3