The enhanced Agenda
from last month's meeting is available.
Calendar
May 26/27 ALMA Board face-to-face (Europe)
ALMA Week 2 June Victoria
- Project news/updates
(Stephane)
- ASAC
face-to-face meeting (Christine)
Presentations are being collected at
ALMAEDM.
- Action items from previous meeting:
- SSR fast
data rate (John, Ewine)
- Operations/Design
Reference Mission working group (someone from WG)
To be covered in normal agenda:
- Site: Memo
No. 451 'Some Error Sources for the PWV and Path Delay Estimated
from 183 GHz Radiometric Measurements at Chajnantor", by Delgado et al.
to be circulated
- Calibration: comments on new
calibration plan
comments on "science examples" document
- Configuration:
- SSR:
summary of AIPS++ review + response circulated ***DONE***
AIPS++ testing Phase II + II circulated ***DONE***
- Imaging:
Mel to look at distribution of time spent on mosaicking/single pointing
for BIMA
Mel reports: " There is a draft memo
available.
In
this memo, we characterize BIMA proposals for the period 2000--2003
into 8 categories: Science, Antenna Configuration, Help Requested,
Special Needs, Observation Type, Polarization, Receiver Band, and
Mosaicing. We present the data as tables and pie charts for each
category. Most, ~90 %, of the proposals requested (and
observed) spectral line data. Most of the proposals requested
antenna
configurations, receiver bands, and observing modes in the regime where
the BIMA telescope works best without any special requirements for
instrument or weather."
- Calibration (Bryan, Stephane)
- MILESTONES: all leaders of level 3 milestones with
March deadlines to report on status. The Milestones, with project
number, are:
Pardo: Science 98121
9.380.98121 ATM software library available 2003-Mar-20 3 Done?
Guilloteau: Science 98201 9.380.98201 Draft of bandpass calibration
plan 2003-Mar-30 3 Late See draft Memo 452.
Wootten: Science 98202 9.380.98202 Draft of phase
calibration plan 2003-Mar-30 3 Done
Guilloteau: Science 98203 9.380.98203 Draft of amplitude calibration
plan 2003-Mar-30 3 Late o
Myers: Science 98204
9.380.98204 Review of SSR plan for phase calibration techniques
2003-Mar-30 3 Late o
Guilloteau,
Bacmann:
Science 98205 9.380.98205 Draft of delay calibration plan 2003-Mar-30 3
Late o
Conway: Science 98206 9.380.98206 Draft of
antenna location determination plan 2003-Mar-30 3 Late o See Memo 427.
Mangum: Science 98207 9.380.98207 Draft of antenna
global pointing
model determination plan 2003-Mar-30 3 Late o
Mangum: Science 98208 9.380.98208 Draft of reference
pointing and focus calibration plans 2003-Mar-30 3 Late o
Myers,
Holdaway:
Science 98209 9.380.98209 Draft of polarization calibration plan
2003-Mar-30 3 Late o
Guilloteau, Wootten, van Dishoeck: Science 98210 9.380.98210 Draft of
operation model for calibration 2003-Mar-30 3 Late o
Hills, Richer: Science 98351 9.380.98351 Draft of WVR technical aspects
document 2003-Mar-30 3 Late o
Holdaway, Conway, Otarola:
Science 98151 9.380.98151 Investigation of Logic of Antenna Motion
2003-Mar-31 3 Late o
Conway: Science 98152 9.380.98152 First revised
configuration (pad position) plan submitted 2003-Mar-31 3 Late o
- new calibration plan
-
Science Examples for calibration: any comments?
New Business -- Agenda
Reports from Subgroups
- Others (outreach, ...)
- Calibration
'Other
Devices'
John Richer and Richard Hills write: "Apart from a some
introductory material to set
the scene, therefore, this
note deals just with the ancillary devices
which will be used aid the primary calibration and, perhaps, the
scheduling.
We have based this on a note put together by Al Wootten which was in
turn taken largely from discussions at the meeting in Cambridge in June
2001.
Clearly there is a good deal more to be done here to determine both the
priority list and the detailed specifications. Please comment along the
lines of:
1) what important items are missing
2) what are the priorities
3) more quantitative specs
4) implementation - i.e. what can we buy and what should we make.
Unfortunately, both of us are unavailable for (the) telecon."
Extended Array
(Holdaway) Mark reports: "The specifications and
reconfiguration docs are not in good shape, but
will serve as drafts and may be useful to illustrate to the Science IPT
Meeting next week that some work is being done.
After I check the viability of the proposed antenna locations, and make
some changes, I need to do two things:
- determine if the required pad changes produce
coverage and
beams that are comparable to what we've got
right now
- if the beam and coverage decays much, determine if
the
less restricted antenna locations can be
moved a bit
to augment the decline in beam/coverage
quality.
Move Sequence (Conway)
- SSR (Lucas)
- Site (Nyman)
- Imaging (Gueth)
Matters Arising
Date of next phone meeting According to the schedule the
next one should be on:
2003, May 6th 15:00 UT