CDR
Documentation Status |
Last Updated: 2007-04-24 14:34:16 |
|
|
|
|
|
|
|
|
|
for Band 6
Cartridge |
Link
to Excel source file (write protected) |
|
|
|
|
|
|
|
|
|
|
Link to
HTML Version |
|
|
|
|
|
|
|
|
|
Document |
Owner |
% Complete |
Status |
Document Location [2] |
Notes Link [1] |
Out for Signature |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mixer Assembly |
|
|
|
|
|
|
|
|
|
|
|
|
|
Epoxy Testing |
Johnson |
|
|
|
Link |
|
|
|
|
|
|
|
|
Mixer
Block Inspection Procedures |
Johnson/Groves |
|
|
Link |
Link |
|
|
|
|
|
|
|
|
Mixer
Block Plating Procedures |
Groves |
|
|
Link |
Link |
Consolidate
cleaning into either these procedures or assembly
doc |
|
|
|
|
|
|
|
Mixer
Assembly Procedures |
Lambeth |
|
|
Link |
Link |
|
|
|
|
|
|
|
|
Phase
Matched Coax Cable RF Testing |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
Cartridge
Assembly |
|
|
|
|
|
|
|
|
|
|
|
|
|
Mechanical
Inspection Procedures |
Horner |
|
|
|
Link |
|
|
|
|
|
|
|
|
Cartridge
Assembly Manual |
|
|
|
|
Link |
|
|
|
|
|
|
|
|
Wiring
Harness Assembly |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
Semi-rigid
Coax Thermal Cycling Procedures |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
LO Window fabrication procedures |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
LO Window Pressure and Leak Test Procedures |
Horner |
|
|
Link |
Link |
|
|
|
|
|
|
|
|
LO Window RF Test Procedures |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
Heater Resistor Assembly Procedures |
Johnson |
|
|
|
Link |
|
|
|
|
|
|
|
|
4K Koller
Heat Sink Assembly and Test Procedures |
Johnson |
|
|
|
Link |
|
|
|
|
|
|
|
|
SS Coax
Heat Strap Assembly |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
SS Coax
Heat Strap RF Testing |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
LO WR-10
Waveguide Assembly |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
LO WR-10
Waveguide RF Test |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
OMWG Heat
Strap Assembly |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
OMWG RF
Testing |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
OMWG
Specification |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
2dB
Attenuator RF Tests |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
Copper IF
Cables RF Testing |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
Temperature
Sensor Dip Testing |
Groves |
|
|
|
|
|
|
|
|
|
|
|
|
LO WG
Bulkhead Feedthrough Leak Test |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
Bias
Protection Board Assembly Specifications |
Horner |
|
|
|
|
|
|
|
|
|
|
|
|
Bias
Protection Board Test Procedures |
Groves |
|
|
|
|
|
|
|
|
|
|
|
|
Cold IF
Amps |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cold IF
Amp Assembly |
Lambeth |
|
|
|
|
|
|
|
|
|
|
|
|
Cold IF
Amp Test |
Lambeth/Morgan |
|
|
|
|
|
|
|
|
|
|
|
|
Mixer
Test System |
|
|
|
|
|
|
|
|
|
|
|
|
|
Write-Up of MTS Power Sensor Comparison |
Groves |
|
|
|
Link |
|
|
|
|
|
|
|
|
MTS
Manual |
Groves |
|
|
|
|
|
|
|
|
|
|
|
|
Cartridge Test System |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cartridge Test System Manual |
Koller |
|
|
Link |
Link |
|
|
|
|
|
|
|
|
OMTs |
|
|
|
|
|
|
|
|
|
|
|
|
|
OMT Cold
Test Data Report to Wollack |
Koller |
|
|
|
Link |
|
|
|
|
|
|
|
|
Software |
Lacasse |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Test
Procedures |
|
|
|
|
|
|
|
|
|
|
|
|
|
Standby
to Operational Mode Timing |
Morgan |
|
|
|
Link |
|
|
|
|
|
|
|
|
Leak Test Procedures |
Horner |
|
|
|
Link |
|
|
|
|
|
|
|
|
Measurement
Error Analysis |
Effland |
|
|
|
Link |
|
|
|
|
|
|
|
|
Vibration,
Shock, and Natural Frequency Testing |
Horner |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Documents
Required for CDR |
|
|
|
Link |
|
|
|
|
|
|
|
|
|
Acceptance
Discrepancy Report |
Effland |
100 |
|
Link |
|
|
|
|
|
|
|
|
|
Bill of
Materials |
Groves |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Compliance
Matrix |
Effland |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Configured
Items Document List |
Effland |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Database
with Cartridge Test and Conf Data |
Effland |
100 |
|
|
Notes |
|
|
|
|
|
|
|
|
Operating
Manual |
Kerr |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
PAI
Review Meeting Agenda |
Effland |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
PAI
Review Meeting Minutes |
Effland |
100 |
|
Link |
|
|
|
|
|
|
|
|
|
PAI
Review Report |
Effland |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
PAI Test
Report |
Effland |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Room
Temperature Test Data |
Schmitt |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Safety
Report |
Koller |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Shipping
Inspection Checklist |
Horner |
100 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
Statement
of Work |
Saini |
60 |
Effland needs to
look at this. |
Link |
Notes |
|
|
|
|
|
|
|
|
Technical
Specifications |
Saini |
100 |
Gie Han doesn't
want edge taper spec. |
Link |
Notes |
2006-09-29 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ICD's |
|
|
|
|
|
|
|
|
|
|
|
|
|
ICD
Between Band 6 Cartridge and Dewar |
|
100 |
Signed |
Link |
Notes |
|
|
|
|
|
|
|
|
ICD
between Cartridges and WCA |
Saini |
60 |
Needs Work |
Link |
Notes |
|
|
|
|
|
|
|
|
ICD from
Band 6 Cartridge to Cartridge Bias Module |
Saini |
60 |
|
Link |
Notes |
|
|
|
|
|
|
|
|
ICD from
Band 6 Cartridge to IF Switch |
Saini |
90 |
Signed |
Link |
Notes |
|
|
|
|
|
|
|
|
ICD
between Band 6 Cartridge and Band 6 1st LO |
Saini |
90 |
Awaiting others
signature |
Link |
Notes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Overall
FE Specifications Document |
Saini |
|
For
reference only although some B6 specs here (Use Version 12) |
Link |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|