544 |
ALMA Memo 460 |
Measurement of
Gain Compression in SIS Mixer Receivers |
12-May-03 |
http://www.alma.nrao.edu/memos/html-memos/alma460/memo460-1.pdf |
533 |
|
Mixer-Preamp
Requirements |
|
|
491 |
|
Product
Engineering Documentation |
|
|
489 |
|
Compliance
Matrix |
|
|
486 |
|
Planning
Chart |
|
|
485 |
|
Work
Breakdown Structure |
|
|
432 |
FEND-40.02.06.03-024-A-SOW |
Band
6 OMT Statement of Work |
|
|
431 |
FEND-40.02.03.03-025-A-SOW |
Band
3 OMT Statement of Work |
|
|
407 |
|
Bugs
In This Software |
|
|
377 |
|
Source
Plates For LO And Sideband Sources |
|
|
372 |
|
Band
6 Cartridge Incoming Inspection Procedures: Rectangular-to-circular
Transitions |
|
|
355 |
|
Front
End Videoconferencing Minutes |
20-Apr-07 |
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfemeet/showFolder/100300/ |
346 |
Memo
#397 |
Proposed
Quartz Vacuum Window Designs For ALMA Bands 3 - 10 |
12-Nov-01 |
http://www.alma.nrao.edu/memos/html-memos/alma397/memo397.pdf |
343 |
FEND-40.02.06.01-036-A-REP |
A
Tentative Mechanism For The Origin Of Sidelobes In The Band 6 Beam Pattern |
02-Mar-05 |
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/103644 |
317 |
FEND-40.02.06.00-132-A-TDR |
Band
6 Cartridge SN 004 PAI Test Report |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/103265 |
313 |
FEND-40.02.06.00-008-A-DWG |
ALMA
Cartridge Mixer Magnet Spool |
06-Feb-03 |
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFile/101899/d20070321134132/No/FEND-40.02.06.04-008-A-DWG.pdf |
303 |
FEND-40.02.00.00-010-A-REP |
Receiver
Optics Design Electromagnetic Analysis |
04-Sep-01 |
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/103097 |
300 |
FEND-40.02.00.00-035-B-REP
(A11) |
Optics
Design Report, Appendix 11 |
22-Jan-07 |
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/103016 |
296 |
|
Change
Request Template |
29-Aug-06 |
http://edm.alma.cl/forums/alma/dispatch.cgi/templates/docProfile/100045 |
295 |
|
Test
Diagram, Warm Pattern Measurement Amplitude Only |
|
|
294 |
|
Mixer-Preamp
Construction Tracking Spreadsheet |
|
\\Cvfiler\cv-cdl-sis\Cartridge\Mixer-Preamp\Mixer-Preamp_Component_Inventory.xls |
288 |
|
LO
Power Excess |
|
\\cvfiler\cv-cdl-sis\CartTstData\CTSpostMove\MIXERcurrentCart002_WCA001mod.xls |
285 |
|
Gain
Stability Measurements Of Band 6 Cartridge SN002 |
|
http://www.cv.nrao.edu/~jeffland/GainStability2005-11-29.pdf |
284 |
|
GAAS
LO Power Amplifier Measurements In Band 6 Cartridge |
|
http://www.cv.nrao.edu/~jeffland/Cartridge/GaAsPwrAmpResults.pdf |
283 |
|
Comparison
Of Calculated And Measured Data For Mirrors Used In ALMA Band 6 Cartridges |
|
http://www.cv.nrao.edu/~jeffland/Cartridge/HIAMechMeas2.2.pdf |
282 |
|
Mixer
Noise Temperature Changes As Function Of Mixer Physical Temperature |
|
http://www.cv.nrao.edu/~jeffland/MxrNoiseTempvsPhysTemp.pdf |
281 |
|
Review
Of Band 6 Cartridge Measurement Data In RAL Cryostat And Cartridge Test
Systems |
|
http://www.cv.nrao.edu/~jeffland/Cartridge/RAL_CTS_Compare2.pdf |
251 |
FEND-40.02.06.00-129-A-REP |
Band
6 Cartridge SN001: PAI Review Report |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102615 |
250 |
FEND-40.02.06.00-127-A-REP |
Band
6 Cartridge SN001: Acceptance Discrepancy Report |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102571 |
249 |
FEND-40.02.06.00-126-A-RFW |
Waiver,
Band 6 Cartridge SN001: Noise Temperature 125% Limit |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102565 |
248 |
FEND-40.02.06.00-125-A-RFW |
Waiver,
Band 6 Cartridge SN001: Cold Plate Linear Alignment |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102564 |
246 |
FEND-40.02.06.00-123-A-RFW |
Waiver,
Band 6 Cartridge SN001: Mass |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102560 |
245 |
FEND-40.02.06.01-029-A-RFW |
Waiver,
Band 6 Cartridge SN001: Beam Efficiency |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102557 |
244 |
FEND-40.02.06.08-011-A-RFW |
Waiver,
Band 6 Cartridge SN001: Vacuum Conditions |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102538 |
243 |
FEND-40.02.06.08-010-A-RFW |
Waiver,
Band 6 Cartridge SN001: Eigen-frequencies |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102537 |
242 |
FEND-40.02.06.00-120-A-RFW |
Waiver,
Band 6 Cartridge SN001: Phase Stability |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102535 |
241 |
FEND-40.02.06.00-119-A-RFW |
Waiver,
Band 6 Cartridge SN001: IF Power Variation |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102534 |
240 |
FEND-40.02.06.00-117-A-RFW |
Waiver,
Band 6 Cartridge SN001: In-band Power |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102532 |
238 |
FEND-40.02.06.00-121-A-MIN |
Minutes
Of Band 6 Cartridge Preliminary Acceptance In-plant (PAI) Review |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102526 |
237 |
|
Band
6 Cartridge SN001: Room Temperature Test Data |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102521 |
236 |
FEND-40.02.06.00-106-A-MAN |
Band
6 Cartridge Operating Manual |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102520 |
234 |
FEND-40.02.06.00-114-A-PLA |
Band
6 Cartridge SN001: PAI Review Meeting Agenda |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102507 |
233 |
FEND-40.02.06.00-113-A-MIN |
Minutes
Of Test Readiness Review 2006-09-15 |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102479 |
230 |
|
Band
6 Test Report: Crosspol Isolation |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102431 |
229 |
FEND-40.02.06.00-108-A-BOM |
Band
6 Cartridge SN001: Bill Of Materials |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102426 |
228 |
FEND-40.02.06.00-109-A-REP |
Band
6 Cartridge SN001: Safety Report |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102415 |
227 |
FEND-40.02.06.00-111-A-PLA |
Agenda
For The Test Readiness Review Meeting For The Band 6 Cartridge |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102382 |
226 |
FEND-40.02.06.00-107-A-LIS |
Band
6 Cartridge SN001: Shipping Inspection Checklist |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/102379 |
222 |
FEND-40.02.06.00-122-A-RFW |
Waiver,
Band 6 Cartridge SN001: Unverified Specifications |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102558 |
221 |
FEND-40.02.06.01-030-A-RFW |
Waiver,
Band 6 Cartridge SN001: Cross-polarization Isolation |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102536 |
220 |
FEND-40.02.06.00-118-A-RFW |
Waiver,
Band 6 Cartridge SN001: Total Out-of-band Power |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102533 |
219 |
FEND-40.02.06.00-116-A-RFW |
Waiver,
Band 6 Cartridge SN001: Image Band Suppression |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102531 |
218 |
FEND-40.02.06.00-112-A-VER |
Band
6 Cartridge SN001: Compliance Matrix |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102505 |
202 |
|
Band
6 Test Report: Mechanical Measurements Of Cartridge 001 |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/100919 |
186 |
FEND-40.10.06.00-001-B01-SPE |
First
Local Oscillator Driver For Band 6 Technical Specifications |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/docProfile/100296/ |
171 |
FEND-40.02.06.01-027-A-REP |
Analysis
Of Beam Patterns At 245 GHz |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101001 |
170 |
None
Assigned |
Preliminary
Results Of The Measurements Of The Band 6 Optics |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/100472 |
167 |
FEND-40.02.06.00-131-A-REP |
Comparison
Of A Common Point And A Mixer Frame Isolated Ground Scheme In Rev. C2
Cartridge Bias Box And Its Effects On Band 6 Cold Cartridge Gain Stability
Measurements |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/103092 |
166 |
FEND-40.02.06.01-031-A-REP |
Band
6 Beam Pattern Measurements, Cartridge B6-001 Update #12 Measurements Through
2005-05-21 |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/101230 |
165 |
FEND-40.02.00.00-035-B-REP
(Appendix) |
Band
6 Pattern Comparison, Summary Appendix For Optics Report |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/102836 |
163 |
FEND-40.02.06.08-012-A-TDR |
Incoming
Inspection Of SRI Hermetics Dual 51-pin Hermetic Connectors SN 0001e Through
0010e |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/103027 |
157 |
|
Bias
Circuit Simulator |
|
\\Cvfiler.nrao.edu\cv-cdl-sis\Cartridge\BiasCkt\IntfConn.dwg |
156 |
FEND-40.02.06.00-071-A-CRE |
Add
New Hole Locations To RAL Drawing Kg0772-635b |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/docProfile/100364/ |
155 |
FEND-40.02.06.00-069-A-CRE |
Change
Access Hole Locations In G10 Sections For Band 6 Cartridge |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/docProfile/100362/ |
149 |
FEND-40.00.00.00-001-A-CRE |
CRE
To Increase Static Thermal Loading Of 110K Stage |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101368 |
146 |
FEND-40.02.06.10-002-A-TDR |
Leak
Test Results For Band 6 Cartridge SN002 |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101415 |
114 |
FEND-40.02.06.02-005-A-REP |
LO
Chain Loss Vs. Frequency, Measured 2005-06-28 (sn 001) |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101555 |
113 |
FEND-40.02.06.02-004-A-REP |
LO
Chain Loss Vs. Frequency (sn001) |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101554 |
105 |
FEND-40.02.06.01-019-A-TDR |
Beam
Pattern Measurements Of Band 6 Cartridge Using Gunn Oscillator As Source |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101731 |
92 |
FEND-40.02.06.00-094-A-SPE |
ALMA
Band 6 Mixer-preamp And Cartridge Measurement System Software Specifications |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/100666 |
91 |
FEND-40.02.06.00-093-A-REP |
Room
Temperature Band 6 IF Amplifier Power Dissipation |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/100996 |
90 |
FEND-40.02.06.00-092-A-DWG |
Band
6 Cartridge Test System Diagram |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/100988 |
88 |
FEND-40.02.06.00-090-A-MAN |
Band
6 Cartridge Test System Manual |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/showFolder/100973 |
83 |
FEND-40.02.06.00-085-A-PRO |
Band
6 Cartridge Test Procedure: Spurious Response |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101879 |
74 |
FEND-40.02.06.00-074-A-TDR |
Allan
Variance Measurements Of Band 6 Cartridge SN002 |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/101711 |
58 |
FEND-40.02.06.00-026-A-INS |
Documentation
Guidelines For Labview Code |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/100607 |
57 |
FEND-40.02.06.00-025-A-INS |
Version
Control Of Labview Software Using Wincvs |
|
http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfile/100984 |
|
|
|
|
|