Responsible: Morgan

***************************************************************************************

RID 1684

Doc. Title
Band 6 design Report Originator: Stephane Claude Date: 2007-09-11

Description:
P106 section 3.8.2. In standbymode the system is already running and what is needed is

to switch from one LO to another (including PLL).
Suggested Solution:
See Band 3 test Phase Stabilization time : Standby to Operation

FEND-40.02-03-00-161-A-REP. Can the same be done for Band 6?
-------------------------------------------------------------------------------------------------------------
Printed 2007-09-18 16:52:58 Page 7 of 8
First Previous Next Last