Band 6 Cartridge and Band 3/6 OMTs:    |
|
Assigned to Filter: |
Sorted by Date Entered (most recent first) |
Task # |
Description | Assigned To |
Dates: Entered / Est.Finish |
Notes | |
Management | |||||
1081 | Return of mixer-preamp 117:081/063:021 | Lambeth | 2007-11-02 2007-11-30 |
  | |
Quality Assurance | |||||
1114 | Document Pull Tests | Lambeth | 2007-11-19 2007-11-22 |
Periodic bondwire pull tests will be entered here. | |
1064 | Check (and replace if required) bonding wire | Lambeth | 2007-10-15 2007-10-18 |
PR 29343 | |
1019 | Document mixers using new bond wires | Lambeth | 2007-09-06 2007-09-09 |
  | |
1011 | Failure: 104:105/098:031 after 15 temp cycles | Lambeth | 2007-09-06 2007-09-09 |
Bond wires too short? | |
Cooled IF Amps | |||||
1249 | Preamps 144-148 | Lambeth | 2008-01-10 2008-01-31 |
  | |
1211 | Production Status | Lambeth | 2007-12-14 2007-12-17 |
Status graph is here: link | |
1206 | Preamps 138-142 | Lambeth | 2007-12-13 2008-01-14 |
Complete and test the next lot of 5 preamps received from ACC on 2007-12-12. It will be delayed due to annual equipment recalibration during the holidays. | |
Mixer Assembly | |||||
1077 | Production status | Lambeth | 2007-10-29 2007-11-01 |
  | |
Amplifier Test System | |||||
1074 | Repackage Components | Lambeth | 2007-10-29 2007-11-16 |
  | |
Miscellaneous Tasks | |||||
1093 | General Tasks | Lambeth | 2007-11-07 2007-11-10 |
For weekly reporting of tasks not otherwise identified in this database |