Band 6 Cartridge and Band 3/6 OMTs:   

Assigned to
Filter:

Sorted by Date Entered (most recent first)

At location '25 'found '\\cvfiler' in 'Status graph is here: \\cvfiler\cv-cdl-sis\Preamps\PampAcceptHistoryjee.xls '.
replaced backward slashes:Status graph is here: //cvfiler/cv-cdl-sis/Preamps/PampAcceptHistoryjee.xls
Stop Position found - StopCharKey = '2', Pos Start = '25', Pos Stop = '79'
Replaced string of length 91 at 79
Forward slashes....
Status graph is here: //cvfiler/cv-cdl-sis/Preamps/PampAcceptHistoryjee.xls">link
Final string is Status graph is here: link
Task
#
Description Assigned
To
Dates:
Entered /
Est.Finish
Notes
Management
1081 Return of mixer-preamp 117:081/063:021 Lambeth 2007-11-02
2007-11-30
 
Quality Assurance
1114 Document Pull Tests Lambeth 2007-11-19
2007-11-22
Periodic bondwire pull tests will be entered here.
1064 Check (and replace if required) bonding wire Lambeth 2007-10-15
2007-10-18
PR 29343
1019 Document mixers using new bond wires Lambeth 2007-09-06
2007-09-09
 
1011 Failure: 104:105/098:031 after 15 temp cycles Lambeth 2007-09-06
2007-09-09
Bond wires too short?
Cooled IF Amps
1249 Preamps 144-148 Lambeth 2008-01-10
2008-01-31
 
1211 Production Status Lambeth 2007-12-14
2007-12-17
Status graph is here: link
1206 Preamps 138-142 Lambeth 2007-12-13
2008-01-14
Complete and test the next lot of 5 preamps received from ACC on 2007-12-12. It will be delayed due to annual equipment recalibration during the holidays.
Mixer Assembly
1077 Production status Lambeth 2007-10-29
2007-11-01
 
Amplifier Test System
1074 Repackage Components Lambeth 2007-10-29
2007-11-16
 
Miscellaneous Tasks
1093 General Tasks Lambeth 2007-11-07
2007-11-10
For weekly reporting of tasks not otherwise identified in this database

Software Vers 2.1 (2007-12-12)