Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On...

Doc. Number
Description
Date Updated
Link
Document Classification:
CRE

FEND-40 02 06 00-134-B- Review of STFC (RAL) Drawings for Cold Cartridge 2007-08-03
http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/show

Body Production

FEND-40.00.00.00-001-A-CRE CRE To Increase Static Thermal Loading Of 110K Stage http://edm.alma.cl/forums/alma/dispatch.cgi/iptfedocs/docProfil

FEND-40.02.00.00-029-A-CRE Update RAL 300K 170 Dia. Cartridge Plate To Latest 2005-08-11
http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/docPr

Cartridge Requirements Per Fend-40.02.00.00-013-g-

dwg

FEND-40.02.06.00-069-A-CRE Change Access Hole Locations In G10 Sections For http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/docPr

Band 6 Cartridge

FEND-40.02.06.00-071-A-CRE Add New Hole Locations To RAL Drawing Kg0772-635b http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/docPr

FEND-40.02.06.00-134-B-CRE Summary Of Mechanical Changes Required For Band 6 2007-05-25
http://edm.alma.cl/forums/alma/dispatch.cgi/f.frontendipt/show

Cold Cartridge Body
__________________________________________________________________________________________________________________
Report:'rptCIDL' (Ver:2007-08-27 13:29:52) Printed: 2007-08-27 1:33:35 PM Page 7 of 23
Datasource: 'qryCIDL' (Ver: 2007-08-27 13:05:11)

\\cvfiler.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\bin\Code_Band6Docs2007-06-26.mdb
First Previous Next Last