Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On... |
| Title | | Status | | Owner | | Link | | Rec. |
__________________________________________________________________________________________________________________ |
| Waiting On: | | Effland |
| Space |
| Band 3 OMT Design Document | Review (by Effland) Required | Koller | http://e | 477 |
| Band 3 OMT SN 051 Test Data Report | Review (by Effland) Required | Koller | http://e | 333 |
| Band 3 OMT SN 073 Test Data Report | Review (by Effland) Required | Koller | http://e | 473 |
| Band 3 OMT Statement of Work | Not Started | Effland | http://e | 431 |
| Band 6 Cartridge 008 PAI Review Meeting Agenda | Modification Required (Draft) | Effland | http://e | 598 |
| Band 6 Cartridge 008 PAI Test Report | Modification Required (Draft) | Schmitt | \\cvfiler. | 587 |
| Band 6 Cartridge General Bill Of Materials | Review (by Effland) Required | Groves | http://e | 529 |
| Band 6 Cartridge Production Plans | Modification Required (Draft) | Schmitt | http://e | 490 |
| Band 6 Cartridge Reliability Report | Review (by Effland) Required | Effland | http://e | 357 |
| Band 6 Cartridge Specification | Signed - Needs modification | Effland | http://e | 32 |
| Band 6 Cartridge Technical Design Document | Signed - Needs modification | Effland | http://e | 67 |
| Band 6 Cartridge Technical Specification, Rev B | Modification Required (Draft) | Effland | http://e | 560 |
| Band 6 Cartridge Test Procedure: IF Output Return Loss | Not Started | Effland | 565 |
| Band 6 Cartridge Test Procedure: Spurious Response | Signing in Progress | Schmitt | http://e | 83 |
__________________________________________________________________________________________________________________ |
Report:'rptInProgressByWaitingOn' (Ver:2008-02-15 13:11:12) | Printed: 2008-02-15 3:05:05 PM Page 1 of 10 |
Datasource: 'SELECT Docs.keyDocs, Docs.ALMA_Number, Docs.Description, |
| \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb |