Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On... |
| Title | | Status | | Owner | | Link | | Rec. |
__________________________________________________________________________________________________________________ |
| Waiting On: | | Effland |
| Space |
| Band 6 OMT SN007 Test Data Report | Checking Required | Koller | http://e | 466 |
| Band 6 OMT Statement of Work | Not Started | Effland | http://e | 432 |
| Band 6 Template for Shipping Inspection Documents | Modification Required (Draft) | Schmitt | http://e | 613 |
| Band 6 Test Procedure: RF Beam Efficiency | Modification Required (Draft) | Schmitt | http://e | 209 |
| Bias Circuit Simulator | Review (by Effland) Required | Lambeth | \\Cvfiler | 157 |
| Bugs In This Software | Modification Required (Draft) | Effland | 407 |
| ICD Between Band 6 Cartridge And Dewar | Signed - Needs modification | Effland | http://e | 174 |
| Mixer-Preamp Construction Tracking Spreadsheet | Modification Required (Draft) | Lambeth | \\Cvfiler | 294 |
| Response to Band 6 Cartridge CDR Action Items | Modification Required (Draft) | Effland | http://e | 567 |
| Revision of the Band 6 Cartridge Technical Specifications | Modification Required (Draft) | Effland | http://e | 556 |
__________________________________________________________________________________________________________________ |
| Waiting On: | | Groves |
| Space |
| Band 6 Cartridge 008 Configured Items Data List | Modification Required (Draft) | Schmitt | http://e | 590 |
| Mixer-Preamp Requirements | Not Started | 533 |
__________________________________________________________________________________________________________________ |
Report:'rptInProgressByWaitingOn' (Ver:2008-02-15 13:11:12) | Printed: 2008-02-15 3:05:15 PM Page 2 of 10 |
Datasource: 'SELECT Docs.keyDocs, Docs.ALMA_Number, Docs.Description, |
| \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb |