Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On...

Title
Status
Owner
Link
Rec.
__________________________________________________________________________________________________________________

Waiting On:
Saini

Space

Band 6 OMT Acceptance Test Plan Signing in Progress Koller http://e 498

Band 6 OMT Block RFQ Signing in Progress Koller http://e 444

Band 6 OMT Specifications Signing in Progress Koller http://e 394

Band 6 OMT Test Procedures Signing in Progress Koller http://e 447

Band 6 Pattern Comparison, Summary Appendix For Optics Report Review (Technical) Required Effland http://e 165

Band-6 Coolable Frequency Tripler - Mechanical Details Signing in Progress Effland http://e 535

Cartridge Bias Module Connector(s) Mechanical Details Signing in Progress Horner http://e 496

Cartridge Bias Module Design Analysis Report Modification Required (Draft) Effland http://e 392

First LO Assembly for Band 6 Configured Items Data List WCA6-10 Signing in Progress Effland http://e 582

First Local Oscillator Driver for Band 6 Acceptance Procedures Modification Required (Draft) Effland http://e 583

First Local Oscillator Driver for Band 6 Acceptance Test Plan Signing in Progress Effland http://e 579

First Local Oscillator for Band 6 Acceptance Report (Serial No 10 / Review (Technical) Required Effland http://e 578

ACA deliverable article)

ICD Between Band 6 Cartridge And Band 6 1st LO Signing in Progress Effland http://e 183
__________________________________________________________________________________________________________________
Report:'rptInProgressByWaitingOn' (Ver:2008-02-15 13:11:12) Printed: 2008-02-15 3:06:16 PM Page 9 of 10
Datasource: 'SELECT Docs.keyDocs, Docs.ALMA_Number, Docs.Description,

\\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb
First Previous Next Last