Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On...

Title
Status
Owner
Link
Rec.
__________________________________________________________________________________________________________________

Waiting On:
Morris

Space

Band 6 Cartridge Shipping Container Not Started Schmitt 623

Notes from: Effland Number assigned by Dave Schmitt? For Band 6-007 Shipping Inspection Checklist, but drawing not yet uploaded to EDM.
__________________________________________________________________________________________________________________

Band 6 Cartridge Transport Tube Not Started Schmitt 622

Notes from: Effland Number assigned by Dave Schmitt? For Band 6-007 Shipping Inspection Checklist, but drawing not yet uploaded to EDM.
__________________________________________________________________________________________________________________

Band 6 Dummy OMT E-Plane Assy Modification Required (Draft) Effland http://ed 584

Notes from: Effland Need to modify drawing to prevent tapped holes from being too shallow:



From: Greg Morris [mailto: gmorris@nrao.edu] (12 kB)

Sent: Thursday, January 10, 2008 9:21 AM

To: John Effland
__________________________________________________________________________________________________________________

Band 6 Dummy OMT E-Plane Bottom Block Signing in Progress Effland http://ed 586

Notes from: Effland
__________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
Report:'rptInProgressByWaitingOnWNotes' (Ver:2008-02-15 13:24:15) Printed: 2008-02-15 1:44:25 PM Page 14 of 29
Datasource: 'SELECT Docs.keyDocs, Docs.ALMA_Number, Docs.Description,

\\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb
First Previous Next Last