Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On... |
| Title | | Status | | Owner | | Link | | Rec. |
__________________________________________________________________________________________________________________ |
| Waiting On: | | Saini |
| Space |
| Band 6 OMT Test Procedures | Signing in Progress | Koller | http://ed | 447 |
| Notes from: Effland | Saini, |
| |
| This is ready for your signature. |
| |
| John |
__________________________________________________________________________________________________________________ |
| Band 6 Pattern Comparison, Summary Appendix For Optics Report | Review (Technical) Required | Effland | http://ed | 165 |
| Notes from: Effland | Ferdinand has made no progress since note below. |
__________________________________________________________________________________________________________________ |
| Band-6 Coolable Frequency Tripler - Mechanical Details | Signing in Progress | Effland | http://ed | 535 |
| Notes from: Effland |
__________________________________________________________________________________________________________________ |
| Cartridge Bias Module Connector(s) Mechanical Details | Signing in Progress | Horner | http://ed | 496 |
| Notes from: Effland | Saini, |
| |
| I don't have permission to replace the DWG file with the signed PDF, so I attached a signed version of the latter at the bottom of the EDM |
| page. Can you please sign and put it at the top? |
| |
__________________________________________________________________________________________________________________ |
__________________________________________________________________________________________________________________ |
Report:'rptInProgressByWaitingOnWNotes' (Ver:2008-02-15 13:24:15) | Printed: 2008-02-15 1:45:44 PM Page 24 of 29 |
Datasource: 'SELECT Docs.keyDocs, Docs.ALMA_Number, Docs.Description, |
| \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb |