Title
ALMA #
Status
Waiting On Link Rec. #
__________________________________________________________________________________________________________________

Responsible:
Dan Koller and John

Effland

Band 3 OMT Test Procedures FEND-40.02.03.03- Review (Technical) Required Effland http://ed 336

Band 3 OMT Test Procedures FEND-40.02.03.03- Signatures Pending Saini http://ed 336
__________________________________________________________________________________________________________________

Responsible:
Dave Schmitt

Band 6 Cartridge SN 004 PAI Test Report FEND-40.02.06.00- Review (Technical) Required Effland http://ed 317

Band 6 Cartridge SN 004 PAI Test Report FEND-40.02.06.00- Modification Required (Draft) Effland http://ed 317

Band 6 Cartridge SN 004 PAI Test Report FEND-40.02.06.00- Review (by Effland) Required Effland http://ed 317

Band 6 Cartridge SN 004 PAI Test Report FEND-40.02.06.00- Review (Technical) Required Schmitt http://ed 317

Band 6 Cartridge Test Procedure: RF Beam Pattern FEND-40.02.06.01- Review (by Effland) Required Effland http://ed 331

Measurement

Band 6 Cartridge Test Procedure: RF Beam Pattern FEND-40.02.06.01- Formatting Required (Draft) Ward http://ed 331

Measurement

Band 6 Cartridge Test Procedure: RF Beam Pattern FEND-40.02.06.01- Checking Required Schmitt http://ed 331

Measurement

Band 6 Cartridge Test Procedure: RF Beam Pattern FEND-40.02.06.01- Signatures Pending Saini http://ed 331

Measurement

Band 6 Cartridge Test Procedure: RF Beam Pattern FEND-40.02.06.01- Review (by Effland) Required Effland http://ed 331

Measurement

Appendix To Band 6 Sidelobe Measurements Using A FEND-40.02.06.01- Modification Required (Draft) Ward http://ed 359

Room Temperature Receiver

Appendix To Band 6 Sidelobe Measurements Using A FEND-40.02.06.01- Modification Required (Draft) Ward http://ed 359

Room Temperature Receiver

Appendix To Band 6 Sidelobe Measurements Using A FEND-40.02.06.01- Signed http://ed 359

Room Temperature Receiver

Band 6 Cartridge Assembly Procedure: Warm IF FEND-40.02.06.13- Review (by Effland) Required Effland http://ed 322

Amplifier Subassembly

Band 6 Cartridge Assembly Procedure: Warm IF FEND-40.02.06.13- Modification Required (Draft) Schmitt http://ed 322

Amplifier Subassembly
__________________________________________________________________________________________________________________
Report:'rptResponsible' (Ver:2007-06-13 11:29:07) Printed: 2007-06-27 8:48:14 AM Page 10 of 47
Datasource: 'qryResponsible' (Ver: 2007-06-11 10:27:12) \\cvfiler.nrao.edu\cv-cdl-
__________________________________________________________________________________________________________________
First Previous Next Last