| Title | | ALMA # | | Status | | Waiting On | Link | Rec. # |
__________________________________________________________________________________________________________________ |
| Responsible: | | Lambeth |
| Mixer-Preamp Construction Tracking Spreadsheet | Review (by Effland) Required | Effland | \\Cvfiler\ | 294 |
| Mixer-Preamp Construction Tracking Spreadsheet | Modification Required (Draft) | Effland | \\Cvfiler\ | 294 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Modification Required (Draft) | Effland | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Review (by Effland) Required | Effland | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Not Started | Lambeth | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Modification Required (Draft) | Lambeth | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Checking Required | Morgan | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Signed | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Review (by Effland) Required | Effland | http://ed | 385 |
| NRAO 4-12 GHz Amplifier Tuning and Testing | FEND-40.02.06.04- | Review (by Effland) Required | Effland | http://ed | 385 |
| Band 6 Mixer-Preamp Repair Manual | FEND-40.02.06.04- | Modification Required (Draft) | Lambeth | http://ed | 389 |
| Band 6 Mixer-Preamp Repair Manual | FEND-40.02.06.04- | Modification Required (Draft) | Lambeth | http://ed | 389 |
| Band 6 Mixer-Preamp Repair Manual | FEND-40.02.06.04- | Review (by Effland) Required | Effland | http://ed | 389 |
| Band 6 Mixer-Preamp Repair Manual | FEND-40.02.06.04- | Review (by Effland) Required | Effland | http://ed | 389 |
| Band 6 Mixer-Preamp Repair Manual | FEND-40.02.06.04- | Not Started | Lambeth | http://ed | 389 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Not Started | Lambeth | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Review (by Effland) Required | Lambeth | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Modification Required (Draft) | Lambeth | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Review (by Effland) Required | Effland | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Modification Required (Draft) | Lambeth | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Review (by Effland) Required | Effland | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Review (by Effland) Required | Effland | http://ed | 387 |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09- | Signed | http://ed | 387 |
| Band 6 Cartridge Cold IF Phase Matched Cable Test | FEND-40.02.06.09- | Review (by Effland) Required | Effland | http://ed | 386 |
| Procedures |
| Band 6 Cartridge Cold IF Phase Matched Cable Test | FEND-40.02.06.09- | Review (by Effland) Required | Effland | http://ed | 386 |
| Procedures |
__________________________________________________________________________________________________________________ |
Report:'rptResponsible' (Ver:2007-06-13 11:29:07) | Printed: 2007-06-27 8:53:12 AM Page 30 of 47 |
Datasource: 'qryResponsible' (Ver: 2007-06-11 10:27:12) | \\cvfiler.nrao.edu\cv-cdl- |
__________________________________________________________________________________________________________________ |