| Title | | ALMA # | | Status | | Waiting On | Link | Rec. # |
__________________________________________________________________________________________________________________ |
| Responsible: | | Mark Harman |
| Band 6 Cartridge 300K Plate (RAL Num: Kg 0772-650- | FEND-40.02.06.00- | Modification Required (Draft) | RAL | http://ed | 62 |
| Cartridge Tube Assembly - MK 2 (RAL Num: Kg 0772- | FEND-40.02.06.00- | Modification Required (Draft) | RAL | http://ed | 65 |
| 652 To 655) |
__________________________________________________________________________________________________________________ |
| Responsible: | | Mark Sullivan |
| Band 6 Cartridge Thermal Isolation Shim | FEND-40.02.06.00- | Modification Required (Draft) | Morris | http://ed | 54 |
| Band 6 Cartridge Thermal Isolation Shim | FEND-40.02.06.00- | Signed | http://ed | 54 |
__________________________________________________________________________________________________________________ |
| Responsible: | | Matt Morgan |
| Band 6 Cartridge Test Procedure: Gain Saturation | FEND-40.02.06.00- | Signatures Pending | Saini | http://ed | 77 |
| Band 6 Cartridge Test Procedure: Gain Saturation | FEND-40.02.06.00- | Review (by Effland) Required | Effland | http://ed | 77 |
| Band 6 Cooled IF Amp Test System Technical | FEND-40.02.06.00- | Signed | http://ed | 293 |
| Description Document |
| Band 6 Cooled IF Amp Test System Technical | FEND-40.02.06.00- | Formatting Required (Draft) | Ward | http://ed | 293 |
| Description Document |
| Band 6 Cooled IF Amp Test System Technical | FEND-40.02.06.00- | Review (by Effland) Required | Effland | http://ed | 293 |
| Description Document |
| Band 6 Cooled IF Amp Test System Technical | FEND-40.02.06.00- | Checking Required | Morgan | http://ed | 293 |
| Description Document |
| Band 6 Cartridge Test Procedure: Stabilization Time | FEND-40.02.06.00- | Signatures Pending | Morgan | http://ed | 306 |
| Measurement |
| Band 6 Cartridge Test Procedure: Stabilization Time | FEND-40.02.06.00- | Signatures Pending | Effland | http://ed | 306 |
| Measurement |
| Band 6 Cartridge Test Procedure: Stabilization Time | FEND-40.02.06.00- | Signatures Pending | Saini | http://ed | 306 |
| Measurement |
| Band 6 Cartridge Test Procedure: Stabilization Time | FEND-40.02.06.00- | Modification Required (Draft) | Effland | http://ed | 306 |
| Measurement |
__________________________________________________________________________________________________________________ |
Report:'rptResponsible' (Ver:2007-06-13 11:29:07) | Printed: 2007-06-27 8:53:59 AM Page 33 of 47 |