Band 6 Cartridge and B3/6 OMT Documentation Status (Unsigned)

Title
Status
Waiting On
Link Rec. #
__________________________________________________________________________________________________________________

Responsible:
Effland (33 unsigned docs, 91 total docs)

Band 6 Document Editing Under ALMA EDM Checking Required Effland http://ed 89

Request for waiver on RF mismatch requirement of Band 6 windows FEND- Modification Required (Draft) Saini 511

40.03.01.04-06080-00

Safety Report Modification Required (Draft) Koller 488

Band 6 Cartridge Technical Design Document Modification Required (Draft) Effland http://ed 67

Review of STFC (RAL) Drawings for Cold Cartridge Body Production Modification Required (Draft) RAL http://ed 509

Bugs In This Software Modification Required (Draft) Effland 407

Management Plan For Band 6 Cartridge Modification Required (Draft) Effland http://ed 278

Band 6 Cartridge Power Density Slope Correction Using Warm IF Amps Modification Required (Draft) Effland http://ww 411

Electromagnetic Properties Of The ALMA Antenna Front-end Analysis (optics) Modification Required (Draft) Morris \\cvfiler\ 402

Cartridge Bias Module Design Analysis Report Modification Required (Draft) Saini http://ed 392

Mixer Noise Temperature Changes As Function Of Mixer Physical Temperature Modification Required (Draft) Effland http://ed 138

Optics Design Report, Appendix 6 Modification Required (Draft) Morris http://ed 299

Specify Plating - Add To Cart Design Doc Not Started Effland http://ww 433

Compliance Matrix Not Started Effland 489

Band 3 OMT Statement of Work Not Started Effland 431

Project Management Plan Not Started Effland 484

Work Breakdown Structure Not Started Effland 485

Product Assurance Plan Not Started Effland 487

Product Engineering Documentation Not Started Effland 491

Configured Items Data List Not Started Effland 492

Band 6 OMT Statement of Work Not Started Effland 432

Planning Chart Not Started Effland 486

Room Temperature Band 6 IF Amplifier Power Dissipation Review (by Effland) Required Effland http://ed 91

Band 6 Cartridge Reliability Report Review (by Effland) Required Effland http://ed 357

Band 6 Pattern Comparison, Summary Appendix For Optics Report Review (Technical) Required Saini http://ed 165

ICD Between Front End Band 6 Cartridge And Front End IF Switch Signed - Needs modification Saini http://ed 182

ICD Between Band 6 Cartridge And Dewar Signed - Needs modification Saini http://ed 174

Front End Product Tree Signed - Needs modification Rudolf http://ed 316

Band 6 Statement Of Work Signing in Progress Webber http://ed 33

ICD Between WCA Connector Plate And Front End WCA Harness Plate Signing in Progress Saini http://ed 185

ALMA Front End Cartridge Bias Module Technical Specifications Signing in Progress Saini http://ed 390
__________________________________________________________________________________________________________________
Datasource: 'SELECT Docs.keyDocs, Docs.Description, Docs.ALMA_Number, Printed: 2007-08-13 8:40:14 AM Page 1 of 4
Report:'rptStatus' (Ver:2007-07-30 18:10:17)