Responsible:
Horner (84 docs)

Band 6 Test Report: Vibration Test Report FEND-40.02.06.00-110-A-TDR Signed http://ed 231
__________________________________________________________________________________________________________________

Band 6 Omwg Specifications And Test Procedures FEND-40.02.06.02-008-A-SPE Signed http://ed 328
__________________________________________________________________________________________________________________

Band 6 LO Waveguide Assembly Procedures FEND-40.02.06.02-007-A-PRO Signed http://ed 326
__________________________________________________________________________________________________________________

Band 6 Omwg Heat Strap Assembly Procedures FEND-40.02.06.00-137-A-PRO Signed http://ed 327
__________________________________________________________________________________________________________________

Band 6 LO Waveguide Window Spacer Fabrication FEND-40.02.06.01-040-A-PRO Signed http://ed 398

Procedures
__________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________

Responsible:
Johnson (8 docs)

Band 6 Cartridge 4K Heat Sink Assembly Procedures Formatting Required (Draft) Ward 379
__________________________________________________________________________________________________________________

Band 6 Cartridge Magnet Coil Assembly Procedure FEND-40.02.06.04-034-A-PRO Formatting Required (Draft) Ward http://ed 314
__________________________________________________________________________________________________________________

SIS Wafer Processing Procedures FEND-40.02.06.04-032-A-PRO Formatting Required (Draft) Ward http://ed 187
__________________________________________________________________________________________________________________

Epoxy Tests FEND-40.02.06.00-088-A-TDR Formatting Required (Draft) Ward http://ed 86
__________________________________________________________________________________________________________________

Mechanical Inspection Of Mixer Blocks 101 To 120 FEND-40.02.06.04-020-A-TDR Formatting Required (Draft) Ward http://ed 139
__________________________________________________________________________________________________________________

Band 6 Mixer Resistor Heater Assembly FEND-40.02.06.04-037-A-PRO Modification Required (Draft) Ward http://ed 339
__________________________________________________________________________________________________________________

Band 6 Cartridge Temperature Sensors Assembly FEND-40.02.06.09-005-A-PRO Signatures Pending Saini http://ed 358

Procedure
__________________________________________________________________________________________________________________

Band 6 Mixer Mechanical Inspection Procedures FEND-40.02.06.04-021-A-PRO Signed Johnson http://ed 150
__________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
Report:'rptStatus' (Ver:2007-06-13 17:11:29) Printed: 2007-06-13 5:25:28 PM Page 11 of 17
Datasource: 'qryStatusListing' (Ver: 2007-06-13 10:14:27)
________________________ \\cvfiler.nrao.edu\cv-cdl-
First Previous Next Last