Title
ALMA #
Status
Waiting On
Link Rec. #
__________________________________________________________________________________________________________________

Responsible:
Lacasse (6 docs)

Documentation Guidelines For Labview Code FEND-40.02.06.00-026-A-INS http://ed 58
__________________________________________________________________________________________________________________

Version Control Of Labview Software Using Wincvs FEND-40.02.06.00-025-A-INS http://ed 57
__________________________________________________________________________________________________________________

Cartridge Data Formats For Delivery To The Front End FEND-40.09.03.00-032-A-DSN Complete (Signatures unneeded) http://ed 342

Integration Centers
__________________________________________________________________________________________________________________

Guide For Software Development Using The Labmap FEND-40.02.06.00-139-A-MAN Modification Required (Draft) Lacasse http://ed 349

Architecture
__________________________________________________________________________________________________________________

Software Architecture For Front End And Cartridge FEND-40.09.00.00-003-A-DSN Review (Technical) Required Lacasse http://ed 307

Test Systems
__________________________________________________________________________________________________________________

Band 6 Cartridge Database Design Description FEND-40.02.06.00-138-A-DSN Signed http://ed 332
__________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________

Responsible:
Lambeth (10 docs)

Band 6 Cartridge Pigtail Harness Construction FEND-40.02.06.09-003-A-PRO Checking Required Schmitt http://ed 145
__________________________________________________________________________________________________________________

Band 6 Cartridge Cold IF Cable Test Procedures FEND-40.02.06.09-007-A-PRO Modification Required (Draft) Lambeth http://ed 386
__________________________________________________________________________________________________________________

Band 6 Cartridge Semi-rigid Cable Thermal Cycling FEND-40.02.06.09-008-A-PRO Modification Required (Draft) Lambeth http://ed 388

Procedures
__________________________________________________________________________________________________________________

Band 6 Cartridge Cold Attenuator Test Procedures FEND-40.02.06.09-006-A-PRO Modification Required (Draft) Lambeth http://ed 387
__________________________________________________________________________________________________________________

Band 6 Cartridge Warm IF Amplifier Chain Test FEND-40.02.06.13-006-A-PRO Modification Required (Draft) Lambeth http://ed 449

Procedure
__________________________________________________________________________________________________________________

Band 6 Cartridge Cold IF Preamp Test Procedures FEND-40.02.06.04-041-A-PRO Modification Required (Draft) Ward http://ed 385
__________________________________________________________________________________________________________________

Band 6 Mixer Assembly Procedures FEND-40.02.06.04-018-A-PRO Modification Required (Draft) Morris http://ed 137
__________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
Report:'rptStatus' (Ver:2007-06-13 17:11:29) Printed: 2007-06-13 5:26:19 PM Page 14 of 17
Datasource: 'qryStatusListing' (Ver: 2007-06-13 10:14:27)
________________________ \\cvfiler.nrao.edu\cv-cdl-
First Previous Next Last