| Title | | ALMA # | | Status | | Waiting On | | Link | Rec. # |
__________________________________________________________________________________________________________________ |
| Responsible: | | Lacasse | (6 docs) |
| Documentation Guidelines For Labview Code | FEND-40.02.06.00-026-A-INS | http://ed | 58 |
__________________________________________________________________________________________________________________ |
| Version Control Of Labview Software Using Wincvs | FEND-40.02.06.00-025-A-INS | http://ed | 57 |
__________________________________________________________________________________________________________________ |
| Cartridge Data Formats For Delivery To The Front End | FEND-40.09.03.00-032-A-DSN | Complete (Signatures unneeded) | http://ed | 342 |
| Integration Centers |
__________________________________________________________________________________________________________________ |
| Guide For Software Development Using The Labmap | FEND-40.02.06.00-139-A-MAN | Modification Required (Draft) | Lacasse | http://ed | 349 |
| Architecture |
__________________________________________________________________________________________________________________ |
| Software Architecture For Front End And Cartridge | FEND-40.09.00.00-003-A-DSN | Review (Technical) Required | Lacasse | http://ed | 307 |
| Test Systems |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Database Design Description | FEND-40.02.06.00-138-A-DSN | Signed | http://ed | 332 |
__________________________________________________________________________________________________________________ |
__________________________________________________________________________________________________________________ |
| Responsible: | | Lambeth | (10 docs) |
| Band 6 Cartridge Pigtail Harness Construction | FEND-40.02.06.09-003-A-PRO | Checking Required | Schmitt | http://ed | 145 |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Cold IF Cable Test Procedures | FEND-40.02.06.09-007-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 386 |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Semi-rigid Cable Thermal Cycling | FEND-40.02.06.09-008-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 388 |
| Procedures |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09-006-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 387 |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Warm IF Amplifier Chain Test | FEND-40.02.06.13-006-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 449 |
| Procedure |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Cold IF Preamp Test Procedures | FEND-40.02.06.04-041-A-PRO | Modification Required (Draft) | Ward | http://ed | 385 |
__________________________________________________________________________________________________________________ |
| Band 6 Mixer Assembly Procedures | FEND-40.02.06.04-018-A-PRO | Modification Required (Draft) | Morris | http://ed | 137 |
__________________________________________________________________________________________________________________ |
__________________________________________________________________________________________________________________ |
Report:'rptStatus' (Ver:2007-06-13 17:11:29) | Printed: 2007-06-13 5:26:19 PM Page 14 of 17 |
Datasource: 'qryStatusListing' (Ver: 2007-06-13 10:14:27) |
________________________ | \\cvfiler.nrao.edu\cv-cdl- |