| Title | | ALMA # | | Status | | Waiting On | | Link | Rec. # |
__________________________________________________________________________________________________________________ |
| Responsible: | | Lacasse | (6 docs) |
| Guide For Software Development Using The Labmap | FEND-40.02.06.00-139-A-MAN | Modification Required (Draft) | Lacasse | http://ed | 349 |
| Architecture |
__________________________________________________________________________________________________________________ |
| Software Architecture For Front End And Cartridge | FEND-40.09.00.00-003-A-DSN | Review (Technical) Required | Lacasse | http://ed | 307 |
| Test Systems |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Database Design Description | FEND-40.02.06.00-138-A-DSN | Signed | http://ed | 332 |
__________________________________________________________________________________________________________________ |
__________________________________________________________________________________________________________________ |
| Responsible: | | Lambeth | (10 docs) |
| Band 6 Cartridge Pigtail Harness Construction | FEND-40.02.06.09-003-A-PRO | Checking Required | Schmitt | http://ed | 145 |
__________________________________________________________________________________________________________________ |
| Band 6 Mixer Assembly Procedures | FEND-40.02.06.04-018-A-PRO | Modification Required (Draft) | Morris | http://ed | 137 |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Semi-rigid Cable Thermal Cycling | FEND-40.02.06.09-008-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 388 |
| Procedures |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Cold Attenuator Test Procedures | FEND-40.02.06.09-006-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 387 |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Cold IF Cable Test Procedures | FEND-40.02.06.09-007-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 386 |
__________________________________________________________________________________________________________________ |
| Band 6 Mixer-Preamp Repair Manual | FEND-40.02.06.04-042-A-PRO | Modification Required (Draft) | Lambeth | http://ed | 389 |
__________________________________________________________________________________________________________________ |
| Bias Circuit Simulator | Review (by Effland) Required | Effland | \\cvfiler. | 157 |
__________________________________________________________________________________________________________________ |
| Band 6 Cartridge Cold IF Preamp Test Procedures | FEND-40.02.06.04-041-A-PRO | Review (by Effland) Required | Effland | http://ed | 385 |
__________________________________________________________________________________________________________________ |
__________________________________________________________________________________________________________________ |
Report:'rptStatus' (Ver:2007-06-13 12:37:15) | Printed: 2007-06-13 3:05:27 PM Page 18 of 21 |
Datasource: 'qryStatusListing' (Ver: 2007-06-13 10:14:27) | \\cvfiler.nrao.edu\cv-cdl- |
__________________________________________________________________________________________________________________ |