| Responsible: | | Effland | (33 unsigned docs, 91 total docs) |
| ICD Between Band 6 Cartridge And Band 6 1st LO | Signing in Progress | Saini | http://ed | 183 |
| ICD Between Cartridges And Warm Cartridge Assembly (WCA) | Signing in Progress | Saini | http://ed | 180 |
__________________________________________________________________________________________________________________ |
| Responsible: | | Groves | (2 unsigned docs, 12 total docs) |
| Band 6 Mixer Test System Manual | Modification Required (Draft) | Groves | http://ed | 87 |
| Source Plates For LO And Sideband Sources | Modification Required (Draft) | Groves | 377 |
__________________________________________________________________________________________________________________ |
| Responsible: | | Horner | (11 unsigned docs, 92 total docs) |
| Band 6 Cartridge 110K Plate | Modification Required (Draft) | RAL | http://ed | 60 |
| Band 6 Cartridge Assembly Procedure | Modification Required (Draft) | Ward | http://ed | 85 |
| Band 6 Cartridge Production Plans | Modification Required (Draft) | Schmitt | http://ed | 490 |
| Band 6 Cartridge Assembly, Cold Side | Modification Required (Draft) | Morris | http://ed | 16 |
| Band 6 Cartridge 300K Plate | Modification Required (Draft) | RAL | http://ed | 62 |
| Band 6 Cartridge Tube Assembly | Modification Required (Draft) | RAL | http://ed | 65 |
| 300K Feed-Thru Connector Assembly | Signing in Progress | Ray | http://ed | 348 |
| Cartridge Bias Module Connector(s) Mechanical Details | Signing in Progress | Saini | http://ed | 496 |
| ALMA Band 6 G10 Support Tube Orientation | Signing in Progress | Morris | http://ed | 297 |
| Band 6 Cartridge Test Procedure: Vibration, Shock, And Natural Frequency Testing | Signing in Progress | Saini | http://ed | 81 |
| 300K Feedthru Connector Housing | Signing in Progress | Ray | http://ed | 347 |
__________________________________________________________________________________________________________________ |
| Responsible: | | Koller | (22 unsigned docs, 39 total docs) |
| Band 3 OMT Drawing Library | Modification Required (Draft) | Morris | http://ed | 338 |
| Procedures For In-plant And On-site Acceptance Of Band 6 OMTs | Not Started | Effland | 413 |
| Procedures For In-plant And On-site Acceptance Of Band 3 OMTs | Not Started | Effland | 412 |
| Band 6 OMT Design Document | Review (by Effland) Required | Effland | http://ed | 478 |
| Band 6 OMT SN002 Test Data Report | Review (by Effland) Required | Effland | http://ed | 458 |
| Band 6 OMT SN008 Test Data Report | Review (by Effland) Required | Effland | http://ed | 467 |
__________________________________________________________________________________________________________________ |
Datasource: 'SELECT Docs.keyDocs, Docs.Description, Docs.ALMA_Number, | Printed: 2007-08-13 8:40:43 AM Page 2 of 4 |
Report:'rptStatus' (Ver:2007-07-30 18:10:17) |
________________________ | \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb |