Band 6 Cartridge and B3/6 OMT Documentation Status (Unsigned)

Title
Status
Waiting On
Link Rec. #
__________________________________________________________________________________________________________________

Responsible:
Koller (22 unsigned docs, 39 total docs)

Band 6 OMT SN007 Test Data Report Review (by Effland) Required Effland http://ed 466

Band 6 OMT SN006 Test Data Report Review (by Effland) Required Effland http://ed 464

Band 6 OMT SN004 Test Data Report Review (by Effland) Required Effland http://ed 463

Band 3 OMT Design Document Review (by Effland) Required Effland 477

Band 3 OMT Acceptance Test Plan Review (by Effland) Required Effland http://ed 497

Band 6 OMT SN001 Test Data Report Review (by Effland) Required Effland http://ed 459

Band 6 OMT Acceptance Test Plan Review (by Effland) Required Effland http://ed 498

Band 3 OMT SN 073 Test Data Report Review (by Effland) Required Effland http://ed 473

Band 6 OMT SN003 Test Data Report Review (by Effland) Required Effland http://ed 460

Band 6 OMT SN009 Test Data Report Review (by Effland) Required Effland http://ed 468

Band 6 OMT Test Procedures Signing in Progress Saini http://ed 447

Band 6 OMT Block RFQ Signing in Progress Saini http://ed 444

Band 3 OMT Test Procedures Signing in Progress Saini http://ed 336

Band 6 OMT Specifications Signing in Progress Saini http://ed 394

Band 3 OMT Specifications Signing in Progress Saini http://ed 335

Band 3 OMT Block Request For Quotes Signing in Progress Saini http://ed 384
__________________________________________________________________________________________________________________

Responsible:
Lacasse (4 unsigned docs, 10 total docs)

Software Architecture For Front End And Cartridge Test Systems Formatting Required (Draft) Effland http://ed 307

Auto LO Software Requirements Modification Required (Draft) Lacasse http://ed 84

Guide For Software Development Using The Labmap Architecture Modification Required (Draft) Lacasse http://ed 349

Data Formats for Cartridge Operating Parameters Signing in Progress Lacasse http://ed 507
__________________________________________________________________________________________________________________

Responsible:
Lambeth (5 unsigned docs, 11 total docs)

Band 6 Mixer Coupling Probe Metal (2) Modification Required (Draft) Lambeth http://ed 499

Band 6 Mixer Assembly Procedures Modification Required (Draft) Lambeth http://ed 137

Band 6 Mixer-Preamp Repair Manual Modification Required (Draft) Lambeth http://ed 389

Mixer-Preamp Construction Tracking Spreadsheet Modification Required (Draft) Effland \\Cvfiler\ 294

Bias Circuit Simulator Review (by Effland) Required Effland \\Cvfiler. 157
__________________________________________________________________________________________________________________
Datasource: 'SELECT Docs.keyDocs, Docs.Description, Docs.ALMA_Number, Printed: 2007-08-13 8:41:05 AM Page 3 of 4
Report:'rptStatus' (Ver:2007-07-30 18:10:17)
________________________ \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb
First Previous Next Last