Band 6 Cartridge and B3/6 OMT Documentation Status (Unsigned)

Title
Status
Waiting On
Link Rec. #
__________________________________________________________________________________________________________________

Responsible:
M. Morgan (5 unsigned docs, 17 total docs)

ALMA Band 6 IF Amplifier Solder Transitions Modification Required (Draft) Morris http://ed 455

IF 4-12 Type III Amp, RF Chan Details For Top Side Modification Required (Draft) Morris http://ed 129

IF 4-12 Type III Amp, RF Chan Details For Bottom Side Signing in Progress Morris http://ed 131

IF 4-12 Type III Amp, Hole And Pocket Details For Bottom Side Signing in Progress Morris http://ed 132

IF 4-12 Type III Amp, Hole And Pocket Details For Top Side Signing in Progress Morris http://ed 130
__________________________________________________________________________________________________________________

Responsible:
Schmitt (16 unsigned docs, 32 total docs)

Measured Parallelism And Concentricity Of Band 6 Cartridge SN001 Checking Required Effland http://ed 143

Band 6 Cartridge Test System Manual Formatting Required (Draft) Ward http://ed 88

LO Power Excess Modification Required (Draft) Effland \\cvfiler\ 288

Band 6 Cartridge Test Procedure: Spurious Response Modification Required (Draft) Effland http://ed 83

Allan Variance Measurements Of Band 6 Cartridge SN002 Review (by Effland) Required Effland http://ed 74

Band 6 Cartridge SN 004 PAI Test Report Review (Technical) Required Effland http://ed 317

Band 6 Cartridge Test Procedure: Noise Performance and Gain Signing in Progress Saini http://ed 205

Band 6 Cartridge Test Procedure: Polarization Alignment Signing in Progress Saini http://ed 107

Band 6 Cartridge Test Procedure: Amplitude Stability Signing in Progress Saini http://ed 78

Band 6 Cartridge Test Procedure: Gain Saturation Signing in Progress Saini http://ed 77

Band 6 Cartridge Test Procedure: Sideband Ratio Measurement Signing in Progress Saini http://ed 76

Band 6 Cartridge Test Procedure:IF Output Power Signing in Progress Saini http://ed 80

Band 6 Cartridge Test Procedure: RF Beam Pattern Measurement Signing in Progress Saini http://ed 331

Band 6 Cartridge Test Procedure: Stabilization Time Measurement Signing in Progress Saini http://ed 306

Band 6 Test Procedure: RF Beam Efficiency Signing in Progress Saini http://ed 209

Band 6 Cartridge Test Procedure: Phase Drift Measurement Signing in Progress Saini http://ed 82
__________________________________________________________________________________________________________________
Datasource: 'SELECT Docs.keyDocs, Docs.Description, Docs.ALMA_Number, Printed: 2007-08-13 8:41:27 AM Page 4 of 4
Report:'rptStatus' (Ver:2007-07-30 18:10:17)
________________________ \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb
First Previous Next Last