Band 6 Cartridge and B3/6 OMT Documentation Status (Unsigned) |
| Title | | Status | | Waiting On | | Link | Rec. # |
__________________________________________________________________________________________________________________ |
| Responsible: | | M. Morgan | (5 unsigned docs, 17 total docs) |
| ALMA Band 6 IF Amplifier Solder Transitions | Modification Required (Draft) | Morris | http://ed | 455 |
| IF 4-12 Type III Amp, RF Chan Details For Top Side | Modification Required (Draft) | Morris | http://ed | 129 |
| IF 4-12 Type III Amp, RF Chan Details For Bottom Side | Signing in Progress | Morris | http://ed | 131 |
| IF 4-12 Type III Amp, Hole And Pocket Details For Bottom Side | Signing in Progress | Morris | http://ed | 132 |
| IF 4-12 Type III Amp, Hole And Pocket Details For Top Side | Signing in Progress | Morris | http://ed | 130 |
__________________________________________________________________________________________________________________ |
| Responsible: | | Schmitt | (16 unsigned docs, 32 total docs) |
| Measured Parallelism And Concentricity Of Band 6 Cartridge SN001 | Checking Required | Effland | http://ed | 143 |
| Band 6 Cartridge Test System Manual | Formatting Required (Draft) | Ward | http://ed | 88 |
| LO Power Excess | Modification Required (Draft) | Effland | \\cvfiler\ | 288 |
| Band 6 Cartridge Test Procedure: Spurious Response | Modification Required (Draft) | Effland | http://ed | 83 |
| Allan Variance Measurements Of Band 6 Cartridge SN002 | Review (by Effland) Required | Effland | http://ed | 74 |
| Band 6 Cartridge SN 004 PAI Test Report | Review (Technical) Required | Effland | http://ed | 317 |
| Band 6 Cartridge Test Procedure: Noise Performance and Gain | Signing in Progress | Saini | http://ed | 205 |
| Band 6 Cartridge Test Procedure: Polarization Alignment | Signing in Progress | Saini | http://ed | 107 |
| Band 6 Cartridge Test Procedure: Amplitude Stability | Signing in Progress | Saini | http://ed | 78 |
| Band 6 Cartridge Test Procedure: Gain Saturation | Signing in Progress | Saini | http://ed | 77 |
| Band 6 Cartridge Test Procedure: Sideband Ratio Measurement | Signing in Progress | Saini | http://ed | 76 |
| Band 6 Cartridge Test Procedure:IF Output Power | Signing in Progress | Saini | http://ed | 80 |
| Band 6 Cartridge Test Procedure: RF Beam Pattern Measurement | Signing in Progress | Saini | http://ed | 331 |
| Band 6 Cartridge Test Procedure: Stabilization Time Measurement | Signing in Progress | Saini | http://ed | 306 |
| Band 6 Test Procedure: RF Beam Efficiency | Signing in Progress | Saini | http://ed | 209 |
| Band 6 Cartridge Test Procedure: Phase Drift Measurement | Signing in Progress | Saini | http://ed | 82 |
__________________________________________________________________________________________________________________ |
Datasource: 'SELECT Docs.keyDocs, Docs.Description, Docs.ALMA_Number, | Printed: 2007-08-13 8:41:27 AM Page 4 of 4 |
Report:'rptStatus' (Ver:2007-07-30 18:10:17) |
________________________ | \\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb |