ALMA Science IPT TeleconPhone Meeting 2003-August-13 |
- Action items from before
the previous meeting:
- Calibration
Action -- MH to consider Science losses in continuum images.
Please note ALMA Memo No. 466.
Status: In draft.
ACTION -- AB: Standing
wave, bandpass memos to be distributed for comment at next Science
IPT meeting. Status: Standing wave memo available.
ACTION -- BB: Calibration reference document is not available outside
the Science IPT. This should be linked on ALMAEDM for reference
purposes.This
has been distributed to the calibration group. Telecon 21st
of august (a thursday). 1500 UT.
- SSR
Action -- Comments in to Richer by 20 May; revised data rate report
due 16 June. Done. See SSR agenda.
- Operations/Design Reference Mission working group (someone
from
WG)
Action -- Design reference mission needs to get off
ground.
This is well along.
- MILESTONES: all leaders of level 3 milestones with
upcoming
deadlines to report on status. The Milestones,
with project number, are available updated
for June 10.
- Calibration
plan and milestones
(Bryan)
- bandpass (Aurore, Stephane)
-3.Design Reference Science Plan (Ewine,
Stephane)
Status of progress on
plan of
action circulated by Ewine
-4. SSR (Lucas)
- Report on SSR activities (Robert)
-5. Configurations
(Conway)
- report on
activities
(Frederic)
- simulations gain
stability (Mark)
- note
by Richard Hills (Richard)
-7 Site (Nyman)
- report on
activities
RFI report available? (Lars-Ake, Simon)
-8 Others (outreach, ...)-9 Any Other Matters Arising
New PR IPT to be formed.