![]() |
ALMA Science IPT TeleconPhone Meeting 2003-September-16 |
- Action items from before
the previous meeting:
- Calibration
ACTION -- BB: Calibration reference document is not available outside the
Science IPT. This should be linked on ALMAEDM for reference purposes.This
has been distributed to the calibration group. Telecon 15th of
September (yesterday). 1500 UT.
- SSR
Action --
see below; discussion on data rates followed report from Richer.
- Operations/Design Reference Mission working group (someone from WG)
Action -- Design reference mission is well along; Ewine reported on it to
the ASAC.
for September 12.
- Calibration
plan and milestones; yesterday's telecon
agenda and minutes
(Bryan)
- bandpass (Aurore, Stephane)
-3.Design Reference Science Plan (Ewine
)
DRSP
-- ASAC report from Ewine (Ewine)
-4 Imaging (Gueth,
Holdaway)
- report on activities (Frederic)
- simulations gain stability
(Mark) and FE
Measurements
-5. SSR (Lucas)
- Data rates discussion (John)
- Report on SSR activities (Robert)
-6. Configurations
(Conway)
-7 Site (Radford,
Nyman)
- report on activities
October 13-14, 2003 : The Search for Other
Worlds