ALMA Science IPT Telecon

Phone Meeting 2003-October-20 


Connection Details


Old Business

The enhanced Agenda from last month's meeting is available, as well as rough notes.

Action items from varioussources:
 Last Meeting:  SSB Requirements should be put into Science Requirements.
                       Comments due on ACA 
                       Distribute username and password for the DRSP website.
Mini-ALMA Week Action Items and Decisions: Science IPT: Complete comments on Antenna Technical specs and corresponding ICDs. All IPTs 15-10-03                                                            See Over-the-top recommendations.                                                                                                                                                          Document to implement five load amplitude calibration device described in ALMA Memo #461 needs to be written SCIE, FEND 26-9-03                                                       See proposed Amplitude Calibration Measurements and CRE.

                        Highlight remaining controversial issues in FE Req documents submitted to CCB. All IPTs 30-9-03  HAW commented.
                         Resolve which calibration documents, “ALMA Calibration” or “Calibration Plan” are defining documents for ALMA.SE, SCIE 15-10.03
                                                         The defining document is, of course, the document due on 31 October.  
                        L2 9835 update description of WVR strategy SCIE 30-9-03
                        L2 9845 Science Verification plan needed earlier than 30-June-2005 SCIE 30-9-03
                        Science Requirement document should be ready to be submitted to the CCB. Wootten 20-10-03  Last moment for comments!
                        IPT input to JAO quarterly report needed. All IPTs, Operations Group 30-9-03  Science IPT Report
                        All IPT leaders or designees to provide to Emerson description of system operational needs by 10 October 2003. Science IPT Report.
Correlator CDR:  "The committee recommends that the Science IPT clarify the conditions under which the spectral dynamic range of 40 dB be required.  Since the ALMA correlator is a 2-bit correaltor, the dynamic range can only be achieved if the narrowband power into the receiver is less than a certain small fraction of the total receiver power.  The Science IPT must quantify what the maximum total narrowband power is into the receivers, as fraction of the total receiver noise power."    

                        "The science specifications indicating what the maximum sensitivity loss of the correlator must be should be further clarified.  Nominally, with the European tunable filter card and a 2-bit correlator, the sensitivity loss in the correlator is 1-(0.88 x 0.985)=.133."   
                        Some simulations may be needed to determine imaging artifacts possibly caused by phase and amplitude errors in overlap region of
                                     tunable filter option for correlator.
AMAC: Simulate imaging using two prototype antennas as examples, if array were to consist of half of one type and half of the other.

     - MILESTONES: all leaders of level 3 milestones with upcoming deadlines to report on status.  The Milestones, with project number, are available updated

for September 12.

New Business -- Agenda

Calendar

Project news/updates (Al)
          Announcements (Ewine)
          Mini-ALMA Week (Al)
          Correlator CDR(Al)
          AMAC Meeting (Ewine)

Reports from Subgroups

   -1 Project Scientists (see above)
         Operations
          D'Addario proto-memos  Phase Calibration,  Atmosphere (with Holdaway).

    -2 Calibration (Butler)

      -  Calibration plan (PB Chapter 3 revision) and milestones;  telecon agenda and minutes (Bryan)
      -  bandpass (Aurore, Stephane)

     -3.Design Reference Science Plan (Ewine )
               DRSP --  report from Ewine (Ewine)

    -4 Imaging (Gueth, Holdaway)         
         - report on activities (Holdaway)

   -5. SSR (Lucas)
       - Report on SSR activities, face-to-face meeting (Robert)

   -6. Configurations (Conway)

    -7 Site (Radford, Nyman)
         - report on activities

     -8  Any Other Matters Arising

Upcoming Meetings