Description AssignedTo Date Who
Notes

Updated
DateEntered
Date Completed

Quality Assurance

Determine Cause of Plating Problems Horner Thu Nov-15 horner Waiting to talk with Tony to obtain his thorghts on asking for leaded solder and rosien flux.

http://www.cv.nrao.e Mon Jun-11 10:24

Determine Cause of Plating Problems Horner Tue Nov-13 horner The type solder CMI uses is SN96, a lead free solder, and Handy Flux type TEC. Should we

http://www.cv.nrao.e Mon Jun-11 7:43
consider asking for leaded solder and rosien flux?

Monitor mixer-preamps for life tests Groves Thu Nov-15 Groves The mixer/preamps for life test purposes have completed their 10th life cycle this week. This

http://www.cv.nrao.e Thu Sep-06 16:19
task should be complete in 3-weeks with a total of 15 cool down/warm up cycles.

SIS Wafer Fab

Production Status Johnson Thu Nov-15 fjohnson DC tested last section of wafer 11.

http://www.cv.nrao.e Tue Nov-06 11:13

Software

Update Schedule Lacasse Fri Nov-16 Lacasse Added task for phase stability to allan variance batch conversion / export program. This task

http://www.cv.nrao.e Thu Sep-06 9:36
was completed this week. Progress was made on LabVIEW program to more easily build

Present Version Control Design Lacasse Fri Nov-16 Lacasse Changed the Test System Server class to optionally load models from LabVIEW libraries or

http://www.cv.nrao.e Wed Nov-07 9:43
directly from source code in the directory structure. Still evaluating feasibilty of this option

Friday, November 16, 2007 Page 3 of 3
First Previous Next Last