Title
ALMA #
Status
Waiting On Link Rec. #
__________________________________________________________________________________________________________________

Responsible:
E. W. Bryerton, J.

Effland, K. S. Saini

ICD Between Band 6 Cartridge And Band 6 1st LO FEND-40.02.06.00- Review (Technical) Required http://ed 183

ICD Between Band 6 Cartridge And Band 6 1st LO FEND-40.02.06.00- Signed http://ed 183

ICD Between Band 6 Cartridge And Band 6 1st LO FEND-40.02.06.00- Modification Required (Draft) Effland http://ed 183

ICD Between Band 6 Cartridge And Band 6 1st LO FEND-40.02.06.00- Signatures Pending Saini http://ed 183
__________________________________________________________________________________________________________________

Responsible:
Ediss and Williams

NA FEIC Preliminary Beam Measurements FEND-40.09.03.00- Complete (Signatures unneeded) http://ed 423
__________________________________________________________________________________________________________________

Responsible:
Ediss, Effland, Kerr,

and Morgan

Band 6 Cartridge Technical Design Document FEND-40.02.06.00- Modification Required (Draft) Effland http://ed 67

Band 6 Cartridge Technical Design Document FEND-40.02.06.00- Modification Required (Draft) Effland http://ed 67

Band 6 Cartridge Technical Design Document FEND-40.02.06.00- Review (by Effland) Required Effland http://ed 67

Band 6 Cartridge Technical Design Document FEND-40.02.06.00- Modification Required (Draft) Morgan http://ed 67

Band 6 Cartridge Technical Design Document FEND-40.02.06.00- Modification Required (Draft) Kerr http://ed 67

Band 6 Cartridge Technical Design Document FEND-40.02.06.00- Modification Required (Draft) Kerr http://ed 67
__________________________________________________________________________________________________________________

Responsible:
Ediss, Harman

ICD Between Band 6 Cartridge And Dewar FEND-40.02.06.00- Signed http://ed 174
__________________________________________________________________________________________________________________

Responsible:
Effland

Management Plan For Band 6 Cartridge FEND-40.02.06.00- Modification Required (Draft) Effland http://ed 278
__________________________________________________________________________________________________________________
Report:'rptResponsible' (Ver:2007-06-13 11:29:07) Printed: 2007-06-27 8:48:40 AM Page 12 of 47
Datasource: 'qryResponsible' (Ver: 2007-06-11 10:27:12) \\cvfiler.nrao.edu\cv-cdl-
__________________________________________________________________________________________________________________
First Previous Next Last