|
ALMA Science IPT Telecon
Phone Meeting 2004-May-18
|
Connection Details
- Call date: 2004-May-18 (Tuesday)
- Call time: 14:30
UT 1030EDT 0430CEST
- Duration: 1 hr
- USA Number: 877-874-1919
- Outside USA Number: +1-203-320-9891
- Passcode: 185064
- Leader: Al Wootten
Old Business
The enhanced Agenda
from last month's meeting is available. Science IPT notes
from last month's telecon. Last Meeting Action items
- Action items from various
sources:
Last month's Science telecon:
ACTION: Wootten get with DTE on satellite. Wilson wrote an email
introducing
the topic to him. Done
ACTION: CSV plan and canvass. Laing provided the plan to Japanese
colleagues.
Done
ACTION: John will work on the antenna location plan
In process, draft availasble (see below)
ACTION: Science IPT telecon date change to third Tuesday. 20 Apr Stay
constant
in local time, change in UT. Done
SE telecon. ACTION: [Wootten]- what is the required IDR for a
single
image. Bring this up in the science telecon.
ACTION:
Science IPT, [Laing]- produce short memo on origin of spec on
differential
gain stability. [N.B. ALMA Tech Requirement No. 264 Differential gain
stability
between channels of a polarization pair 5e-4 at 300 sec TBC allocation
to
FE and BE are each 0.707 of this value 320 23] Holdaway has written protomemo.
ALMA Week: [Wootten]Provide detailed values on solar filter to
FEND
by 30 April Late
[Laing] Develop a requirement for
stitching
together the BEND 2 GHz sections for overlap.
In process
[Conway, Laing] Choose antenna stations where first antennas
will
be located for first fringes. 4-30-04 [See CSV
document]
[with SE] Decide when antennas are handed over to
Commissioning
(after 1st light or 1st fringes?) 6-01-04
[Wootten & Co] Write System Review Report Done
MILESTONES: all leaders of level 3 milestones with upcoming deadlines
to report on status. The Milestones,
with project number, are available updated for March.
New Business -- Agenda
ALMA Calendar
- 7 April -- ASAC Telecon Agenda
- 10-11 May -- ASAC Face-to-face meeting, Cambridge, England
- 14-15 May -- ALMA/NA Meeting, U. of Maryland Agenda
- 18 May -- Science IPT Telecon
- 25-26 May -- ALMA Backend Review, Arcachon, France
- 27 May -- ALMA Board Telecon
- 7-8 June -- Band 7 PDR, Grenoble, France
- 15 June -- Science IPT Telecon
- 22-23 June -- ALMA Board Meeting, Garching
- 8-10 July -- Software IPT CDR2, Denver Colorado
- 24 September -- ALMA/EU Meeting, Garching
- 11-12 October -- AMAC, Florence Italy
- Project news/updates
(Wootten and Wilson)
*
ASAC Meeting -- Strawman
Agenda for Face-to-face Meeting (Wilson)
* Presentations available
on almaedm--Meetings--2004--ASAC
* JAO Positions (Wootten)
* ALMA Science Workshop Meeting 14-15
May 2004. Agenda
Abstract
Book (Wootten)
Reports from Subgroups
-1 Project
Scientists (see above)
* System Review 1-3 March 2004 during
mini-ALMA week Report.
* ALMA/NACommunications Newsletter
* Operations Group and the Operations
Plan
* Please read and comment upon CCB
Agenda Items
-2. Configurations
(Conway)
- A draft
version of John's memo on ALMA antenna position calibration is
available. Please note particularly the diagrams at the end.
- A draft
version of the Spec document of ALMA first science configuration
-3 Calibration
(Mangum)
- The Requirements and Specifications August
03 Version (Wootten)
- Draft
Bandpass Calibration Memo. from Bacmann and Guilloteau (2 of 3
reviews, both favorable, received)
- Very drafty Calibration
plan.
- Plan for further tests of
amplitude calibration devices: Progress? (Martin-Pintado)
- Please see WVR
report to the ASAC at the ASAC presentations section of almaedm.
- Please see the report
from Berkeley on the absolute calibration via gain horn experiment.
-4.Design Reference Science Plan (Hogerheijde
)
Some new
responses have been received. Explanation of one person's
considerations in ALMA Memo No. 492 by Carilli.
See link.
-5 Imaging (Gueth,
Holdaway)
- IDR What Image Dynamic
Range
should we place a requirement on for a single ALMA field? Or
should
we? Request from SE.
-6. SSR (Lucas?)
- Minutes
of last week's meeting. Data rate memo.
-7 Site (Radford,
Nyman)
- ICDs
-8 Operations,
Science Commissioning and Verification (Laing)
-
Draft ALMA Commissioning and Science Verification
Plan
CSV Group -- Laing, Emerson, Chandler, Lucas, Mangum, Shepherd,
Wilson,
Wootten
-9 Any Other Matters Arising
Upcoming Meetings
Upcoming Meetings - Wootten
ALMA Workshop May 14-15,
University of Maryland
Exploring the
Cosmic Frontier:
Astrophysical Instruments for the 21st Century 18-21 May 2004 Berlin, Germany
From
Spitzer
to Herschel and Beyond: The Future of Far IR Space
Astrophysics
7-10 June 2004 Pasadena, California
International
Symposium on Molecular Spectroscopy 59th
Meeting - - June 21-25, 2004
Cores, Disks, Jets
& Outflows in Low & High Mass Star Forming Environments:
Observations, Theory
and Simulations July 12-16, 2004 Banff, Alberta, Canada
The Cool
Universe: Observing Cosmic Beginnings 2004
October 4-8 Universidad Tecnica Federico Santa Maria, Valparaiso,
Chile
New
Windows
on Star Formation in the Cosmos 2004 October 11-13
University of
Maryland, College Park, Maryland
Dusty and
Molecular Universe
27-29 October 2004, Paris
Protostars
and Planets
V 24 - 28 October 2005 Hilton Waikoloa Village, The Big
Island,
Hawaii