New ALMA Logo

ALMA Science IPT Telecon

Phone Meeting 2004-April-20


Connection Details


Old Business

The enhanced Agenda from last month's meeting is available.  Science IPT notes from last month's telecon. Last Meeting Action items    
Action items from various sources:
Last month's Science telecon:

ACTION: Wootten get with DTE on satellite. Wilson wrote an email introducing the topic to him. Done
ACTION: CSV plan and canvass. Laing provided the plan to Japanese colleagues. Done
ACTION: John will work on the antenna location plan        In process
ACTION: Science IPT telecon date change to third Tuesday. 20 Apr Stay constant in local time, change in UT. Done

SE telecon.  ACTION: [Wootten]- what is the required IDR for a single image.  Bring this up in the science telecon.
                   ACTION: Science IPT, [Laing]- produce short memo on origin of spec on differential gain stability. [N.B. ALMA Tech Requirement No. 264 Differential gain stability between channels of a polarization pair 5e-4 at 300 sec TBC allocation to FE and BE are each 0.707 of this value 320 23]

ALMA Week:  [Wootten]Provide detailed values on solar filter to FEND by 30 April
                        [Laing] Develop a requirement for stitching together the BEND 2 GHz sections for overlap.      
                        [Conway, Laing] Choose antenna stations where first antennas will be located for first fringes.  4-30-04   [See CSV document]   
                        [with SE]  Decide when antennas are handed over to Commissioning (after 1st light or 1st fringes?) 6-01-04
                        [Wootten & Co] Write System Review Report  In process

             MILESTONES: all leaders of level 3 milestones with upcoming deadlines to report on status.  The Milestones, with project number, are available updated for March.

New Business -- Agenda

 ALMA Calendar 

LAMA Memo Series  has  inhabitants!

Project news/updates (Wootten and Wilson)
     * AMAC Meeting
     * ALMA Board Meeting
     * JAO Positions
     * ASAC  -- Strawman Agenda  for Face-to-face Meeting

Reports from Subgroups

   -1 Project Scientists (see above)
     * System Review 1-3 March 2004 during mini-ALMA week  Report.  (Not yet available).
     *  Science IPT Quarterly  report     ALMA/NACommunications  Newsletter
     * Operations Group and the Operations Plan
     * Please read and comment upon DAR  123. ALMA System Technical Requirements Skip to reply button for entry 123.
        
    -2 Calibration (Mangum)
      - The Requirements and Specifications August 03 Version (Wootten)
      -  Draft Bandpass Calibration Memo. from Bacmann and Guilloteau (2 of 3 reviews, both favorable,  received)
                    - Very drafty Calibration plan.
      -  Plan for further tests of amplitude calibration devices:   Progress? (Martin-Pintado)
      -  Discussion of Mark's    (Holdaway) which argues:
       ACA baselines are so short that you don't need phase calibration.
       The Weather is so unpredictable that the ACA needs dynamic scheduling.
       Fast switching won't help the ACA.
       WVR could help increase the efficiency of the ACA.
 BUT: 
        If the ACA is going to get correlated with ALMA,
          the ACA antennas absolutely need fast switching and WVR.

     -3.Design Reference Science Plan (Hogerheijde )
          Review of calibration questionnaire responses--50% have had replies.  See link.

    -4 Imaging (Gueth, Holdaway)  
        - IDR  What Image Dynamic Range should we place a requirement on for a single ALMA field?  Or should we?  Request from SE.      

   -5. SSR (Wootten, in lieu of)
       -  Minutes of last week's meeting.
      
   -6. Configurations (Conway)

    -7 Site (Radford, Nyman)
         -  Summary of min, max temperature and barometric pressure range
         -   ICDs

   -8 Operations, Science Commissioning and Verification (Laing)

       - Draft ALMA Commissioning and Science VerificationSkip to reply button for entry 1. Plan  CSV Group -- Laing, Emerson, Chandler, Lucas, Mangum, Shepherd, Wilson, Wootten
    -9  Any Other Matters Arising
                   ALMA Workshop 14-15 May 2004.  Agenda (Wootten)

Upcoming Meetings

  Upcoming Meetings - Wootten

ALMA Workshop May 14-15, University of Maryland

Exploring the Cosmic Frontier: Astrophysical Instruments for the 21st Century   18-21 May 2004 Berlin, Germany

From Spitzer to Herschel and Beyond:  The Future of Far IR Space Astrophysics  7-10 June 2004 Pasadena, California

International Symposium on Molecular Spectroscopy 59th Meeting - - June 21-25, 2004

Cores, Disks, Jets & Outflows in Low & High Mass Star Forming Environments: Observations, Theory and Simulations  July 12-16, 2004  Banff, Alberta, Canada

The Cool Universe: Observing Cosmic Beginnings   2004 October 4-8  Universidad Tecnica Federico Santa Maria, Valparaiso, Chile

New Windows on Star Formation in the Cosmos  2004 October 11-13 University of Maryland, College Park, Maryland

Dusty and Molecular Universe  27-29 October 2004, Paris

Protostars and Planets V  24 - 28 October 2005  Hilton Waikoloa Village, The Big Island, Hawaii