MMA Imaging and Calibration Group

Minutes for meeting Tuesday, 4 June 2002 at 4:00pm EDT.

Date: 4 June 2002

Time: 4:00 pm EDT pm EDT (2:00 pm Socorro, 1:00 pm Tucson)

Phone: (434)296-7082 (CV SoundStation Premier Conference phone 3rd floor).

Past minutes, etc on MMA Imaging and Calibration Division Page
 

Agenda


 --------
 
 

News. -Wootten

News from my point of view. Report for February-March for ALMA/US Science IPT has been submitted. Time for April-May now, so please send a report of your activities.
 
--------
 
 

Y+ Configuration - Butler, Holdaway, Otarola

 
 Progress; discussion of coordinates to send the negotiators. Please review the text from Stephane on the largest configuration.
 
 
 
--------
 
 

Meetings Past and Future - Wootten


  Report from ALG telecon
  The JAO meets next week in Charlottesville, Weds-Fri.
  Sitescape is ready for your trial. Check it out!
 ASAC Agenda for 5 June. The Charges from the Alma Board are of special interest.
--------
 

Calibration--Butler, Mangum


  The AAS is meeting in Albuquerque in June. Some plans for the new ALMA backdrop are at stuff.
  Issues: Calibration Group Set Up
  More on the photonic calibration: Comments by Larry.
 3)Comments? Discussion?
 3)3-1) How stable?
 3)3-2) Over how long?
 Recent Memos:
 2) evaluate the dual load system on the Vertex antenna and the semi-transparent vane on the A/C/E antenna (or both on both). In my view neither of these systems is ready for production. Both have been tried in the past and abandoned for reasons we think a little engineering could solve. But we need some commitment from the FE group, already overstressed by the need for a receiver(s)... Because of the interaction between front ends, antenna and the calibration system I think we need at least one receiver at the ATF ready to test when evaluation finishes on 1 Jan 2004. (I think it should be a prototype band in an RAL dewar with Carter's system but...) Some major questions remain--for instance do we need two loads for the semi-transparent system? Can we measure coupling of the dual load system well enough? Enumerating these is an action item in itself. See Memo 372, also JGM is working on revision of his memo.
  New Memo 422 (for review). New Memo 423 (for review).
 Other Lucas' list of simulation requirements to be discussed in Granada
 
--------

Star Wars -- Others?

Any other reviews of the movie?
 
 
--------
 

Upcoming Meetings - Wootten

May 2 ASAC agenda.

MAY 6-9 Astrophysics of Life Space Telescope Science Institute Wootten attending

May 24 ESO Committee of Council

June 2 - 6 AAS Meeting Albuquerque

JUN 18-21 Scientific Frontiers in Research on Extrasolar Planets at Carnegie Institution See ALMA abstract. Program now online with two ALMA posters:
Session: Ground-based Planet Search Instruments: ALMA
Jean-Francois Lestrade, Observatoire de Paris/LERMA
"Astrometry at millimeter wavelengths with ALMA to search for extrasolar planets or to determine their orbits"
Henry Alwyn Wootten, National Radio Astronomy Observatory
"Extrasolar Planet Research with the Atacama Large Millimeter Array"

JUN 24 AMAC Meeting Munich

AUG 17/24 URSI General Assembly, Maastricht, the Netherlands Butler attending

AUG 22/28 SPIE Symposium on Astronomical Telescopes and Instrumentation, Waikoloa, Hawaii. Brown, Wootten attending

SEP 9-13 Winds, Bubbles and Explosions

--------
 
 

Travel

 Oh, always

 ------

  --------------2942E4F9EC5C2AACB412A3D8-- SCID-90.01.00.00-001-REP