Agenda

------------

Old Business

Al's updated minutes of the teleconference are available .

Any further thoughts on metrics??

New Business

PDR Plans.

Details for the Configuration PDR

1) Date and Place

Date: February 26 and 27

Location: IRAM, Grenoble

2) Attendant List (PLEASE COMPLETE OR DELETE)

Jaap Baars

Bryan Butler

John Conway

Darrel Emerson

Frederic Gueth

Stephane Guilloteau

Steven Heddle

Mark Holdaway

Masato Ishiguro

Ryohei Kawabe

Leonia Kogan

Angel Otarola

Jerome Pety

Koh-Ichiro Morita

Simon Radford

Seiichi Sakamoto

Francois Viallefond

Adrian Webster

Al Wootten

Min Yun

+ ASAC members to be confirmed (M.Ishiguro + others)

Possible invited members / reviewers (to be contacted urgently)

Lee Mundy Contacted by SG...

Dave Woody

Eric Keto

Mel Wright

Bob Sault

Review Board

  • Two outside reviewers
  • Division Heads/Team Leaders/Project Managers/Project Scientists

    S. Guilloteau

    A. Wootten

    D. Hoffstadt

    Mark Rafal (unable to attend)

    Richard Kurz

    Jaap Baars

    Darrel Emerson

    Other affected DH/TLs.

    I would like to have also some representative from the logistic (D.Hoffstadt if possible).

    3) Documents

    To be ready 2 weeks in advance for distribution, specially to the outside members. We already have a lot, but are weak on operation issues. Gross distribution

    - Nested Ring concept (Yun / Butler)

    - Spiral concept (Conway)

    - Multi-configuration aspects (Viallefond)

    - Compact array issues (Morita / Guilloteau)

    - Site issues (Radford / Butler)

    - Operation concepts (Wootten / Guilloteau) (oops, have to work here...)

    - Cost issues (Hofstadt / ? )

    Goal of the meeting: select a baseline design to continue with detailed implementation work ...

    Updates

    The CLEAN and difference results for B arrays for all three declinations and all five test images, with directly comparable grey scale difference images, have been posted on my website, available under Steven's Lair. This now shows CLEAN and difference images for all declinations and test images, with the grey scale difference plots directly comparable. Opinins?

    Steven calculated fidelity images for the CYG, MPD and SDC examples for the B resolution at the same time as the C array ones posted earlier, so has posted them for perusal at his site.

    Are the procedures used sensible? How do we improve on this? How do we make use of the outputs?

    Koh-Ichiro Morita has made a summary of my recent imaging simulations for ACA. The summary may be seen at this URL. Any comments or questions are welcome.

    Brief summary:

  • 1. Imaging simulations show that it is hard to obtain significant improvement by simple adding of ACA data with ALMA data.
  • 2. I have proposed the modified method (method-2) to use smoothed total power data instead of raw total power data from 12 m antennas. Improvements of imaging quality have been obtained by this method.
  • 3. Imaging simulation using the method-2 shows that ACA with 6 m antennas would provide better performance on wide field imagings than that of with that with 8 m antennas.

    Please read Advance of Alma simulation at IRAM by F. Gueth, S. Guilloteau, R. Moreno and J. Pety considering the performance of ALMA with the ACA.

    Simulation Strategy outline at the Tucson meeting is found here. What changes should we adopt based on our experiences so far?

    Other Future Plans

    The plans for the layout of the pads must be finalized by the beginning of construction. We hope that the first construction funds will arrive on 2001 Oct 1 when the FY2002 begins here. The project WBS has this date as 2002 Jan 1. Realistically, I think we need to inspect the pad sites before finalizing their location. As a start, Wootten compared pad locations for the spiral and nested ring arrays, and Butler and Radford did some studies in December 2001. There exists a list of possible problem pad locations for the 3km 1.6km and 0.8 km and Spiral array. Hopefully, these sites are, in fact, OK. Are there any others which folks have worried about?

    Next Meeting?