Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On...

Title
Status
Owner
Link
Rec.
__________________________________________________________________________________________________________________

Waiting On:
Morris

Space

WCA Harness Plate Not Started Effland http://e 573
__________________________________________________________________________________________________________________

Waiting On:
Rudolf

Space

Band 6 Cartridge 007 PAI Review Meeting Minutes Signing in Progress Effland http://e 621

Front End Product Tree Signed - Needs modification Effland http://e 316
__________________________________________________________________________________________________________________

Waiting On:
Saini

Space

Acceptance Report for Front-End Assembly SN-01 Modification Required (Draft) Effland http://e 616

ALMA First Local Oscillator Driver Experimental Procedures for Modification Required (Draft) Effland http://e 580

Acceptance Tests

ALMA Front End Cartridge Bias Module Technical Specifications Signing in Progress Effland http://e 390

Band 3 OMT Acceptance Test Plan Signing in Progress Koller http://e 497

Band 3 OMT Block Request For Quotes Signing in Progress Koller http://e 384

Band 3 OMT Specifications Signing in Progress Koller http://e 335
__________________________________________________________________________________________________________________
Report:'rptInProgressByWaitingOn' (Ver:2008-02-15 13:11:12) Printed: 2008-02-15 3:05:58 PM Page 7 of 10
Datasource: 'SELECT Docs.keyDocs, Docs.ALMA_Number, Docs.Description,

\\Cvfiler.cv.nrao.edu\cv-cdl-sis\Cartridge\Documentation\Database\Code_Band6Docs.mdb
First Previous Next Last