Band 6 Cartridge and B3/6 OMT Documentation Status: Waiting On...

Title
Status
Owner
Link
Rec.
__________________________________________________________________________________________________________________

Waiting On:
Saini

Space

Band 3 OMT Test Procedures Signing in Progress Koller http://e 336

Band 6 Cartridge 001: Acceptance Discrepancy Report Signing in Progress Effland http://e 250

Band 6 Cartridge 001: PAI Review Report Signing in Progress Effland http://e 251

Band 6 Cartridge Test Procedure: Amplitude Stability Signing in Progress Schmitt http://e 78

Band 6 Cartridge Test Procedure: Gain Saturation Signing in Progress Schmitt http://e 77

Band 6 Cartridge Test Procedure: IF Output Power Signed - Needs modification Schmitt http://e 80

Band 6 Cartridge Test Procedure: Phase Drift Measurement Signing in Progress Schmitt http://e 82

Band 6 Cartridge Test Procedure: Polarization Alignment Signing in Progress Schmitt http://e 107

Band 6 Cartridge Test Procedure: RF Beam Pattern Measurement Signing in Progress Schmitt http://e 331

Band 6 Cartridge Test Procedure: Sideband Ratio Measurement Signing in Progress Schmitt http://e 76

Band 6 Cartridge Test Procedure: Stabilization Time Measurement Signing in Progress Schmitt http://e 306

Band 6 Cartridge Test Procedure: Vibration, Shock, And Natural Signing in Progress Horner http://e 81

Frequency Testing

Band 6 First LO Driver Assembly WCA6-10 Shipping Inspection Modification Required (Draft) Effland http://e 581

Checklist
__________________________________________________________________________________________________________________
Report:'rptInProgressByWaitingOn' (Ver:2008-02-15 13:11:12) Printed: 2008-02-15 3:06:06 PM Page 8 of 10