ALMA Science IPT TeleconPhone Meeting 2004-June-15 |
SE telecon. ACTION: [Wootten]- what is the required IDR for a
single
image. Bring this up in the science telecon.
ACTION:
Science IPT, [Laing]- produce short memo on origin of spec on
differential
gain stability. [N.B. ALMA Tech Requirement No. 264 Differential gain
stability
between channels of a polarization pair 5e-4 at 300 sec TBC allocation
to
FE and BE are each 0.707 of this value 320 23] Holdaway has written protomemo.
ALMA Week: [Wootten]Provide detailed values on solar filter to
FEND
by 30 April Late
[Laing] Develop a requirement for
stitching
together the BEND 2 GHz sections for overlap.
In process
[Conway, Laing] Choose antenna stations where first antennas
will
be located for first fringes. 4-30-04 [See CSV
document]
[with SE] Decide when antennas are handed over to
Commissioning
(after 1st light or 1st fringes?) 6-01-04
[Wootten & Co] Write System Review Report Done
MILESTONES: all leaders of level 3 milestones with upcoming deadlines to report on status. The Milestones, with project number, are available updated for March.
-4.Design Reference Science Plan (Hogerheijde
)
-5 Imaging (Gueth,
Holdaway)
- IDR
-6. SSR (Lucas?)
- Minutes
of last week's meeting. Data rate memo.
-7 Site (Radford,
Nyman)
- ICDs
-8 Operations,
Science Commissioning and Verification (Laing)
Group -- Laing, Emerson, Chandler, Lucas, Mangum, Shepherd,
Wilson,
Wootten
-9 Any Other Matters ArisingInternational Symposium on Molecular Spectroscopy 59th Meeting - - June 21-25, 2004
New
Windows
on Star Formation in the Cosmos 2004 October 11-13
University of
Maryland, College Park, Maryland
Dusty and Molecular Universe 27-29 October 2004, Paris
Protostars
and Planets
V 24 - 28 October 2005 Hilton Waikoloa Village, The Big
Island,
Hawaii