Papers
Technical Memos
- Demonstration and Analysis of ngVLA Short Baseline Array Extended Structure Imaging (ngVLA memo 67, Oct 2019; Updated January 2021)
- The ngVLA Short Baseline Array (ngVLA memo 43)
- Guide to NEW SPW PHASE DIAGNOSTIC PLOTS IN THE ALMA PIPELINE WEBLOG (Cycle 5 pipeline; Nov 2017)
- ALMA SPW-phase stability investigation report (March 2017)
- Total Power Integration Time Requirements for Two Representative NGVLA Configurations (Nov. 2016, updated Apr. 2017)
- ALMA Cycle 3 Bandwidth Switching Test Observations Report (ALMA EOC Memo 15, Sept 2014) -- current link on ALMA Science Portal
- ALMA Cycle 3 Bandwidth Switching Observing Mode Use Case and General Considerations (ALMA EOC Memo 16, Sep. 2014) - current link on ALMA Science Portal
- Assessing and Improving Low SNR Calibration Solutions in Narrow-Bandwidth ALMA Spectral Windows (NAASC memo draft, July 2014)
- Band-Averaged MUSTANG-2 Aperture Illumination and Implications for Out of Focus Holography (GBT Memo 287, B.Mason, Feb 2014)
- Parameter Uncertainties in IMFIT (CASA technical note, March 2014; associated with CAS-3476)
- Relative Integration times for the ALMA 12-m, 7-m, and Total Power Arrays (NAASC Memo 113/ALMA Memo 598, July 2013)
- The Continuum Sensitivity of GBT Receivers (GBT Memo 282, May 2013)
- MUSTANG-2 Detector Noise and Saturation Power Specification Analysis (GBT Memo 280, Aug 2012)
- MUSTANG-2 Loading and Bandpass Optimization (GBT Memo 279, June 2012)
- MUSTANG-1.5 and MUSTANG-2 Sensitivity Projections (September 2012)
- The Effects of Weather on MUSTANG Data Quality (GBT Memo 269, Oct 2010)
- Ka-band/CCB Instrumental Calibration (GBT Memo 261, March 2008)
- Pseudo-Continuum Polarimetry with the GBT (GBT Memo 253, Sept 2007)
- MUSTANG Fall 2006 Engineering Run Results (GBT Memo 252, March 2007)
- Results from Mapping Scan Tests with GBT (PTCS Project Note 34, Feb 2004)
- Daisy Scan Mode for GBT (PTCS Project Node 33, December 2003)
- Science with Bolometer Arrays on the GBT (GBT Memo 251, June 2003)