Band 6 Cartridge Test Memos, Data, and Photos

Note: These documents were written prior to transitioning to the ALMA EDM server, which is private.

Revised: Tue 2017-08-29 12:36:00

 Memos (All documents are 'pdf' files)

Title of Document

Date

Production Schedule for ALMA-B and ALMA-J

2007-09-20

Meeting Minutes, Revised Action Plan, and Schedule to Investigate and Resolve Out-of-Spec Beam

2007-02-15

Action Plan to Investigate Sidelobes in Band 6 Cartridges

2007-02-13

Band 6 Cartridge Gain Stability Anomalies with Rev C2 Bias Supplies (with Dave Schmitt)

2007-01-10

Noise Temperature and Gain Slope Considerations for Band 6 Cartridge Operating over 4-12 GHz (with John Webber)

2006-09-11

ALMA Document Status

2006-09-08

ALMA Front End Allan Variance Predictions vs. Antenna Cabin Temperature Stability (with Kamaljeet Saini)

2006-06-28

Cascade Noise Analysis of Band 6 Cartridge

2006-06-14

Band 6 Cartridge Power Density Slope Correction Using Warm IF Amps

2006-05-17

Slope Correction Using Warm IF Amps for Band 6 Cartridges

2006-05-11

Gain Slope Measurements of Band 6 Cartridges 001 and 003

2006-04-28

Mutual Interference Measurements Between Band 6 Mixer and Cartridge Test Systems

2006-03-31

Warm IF Cable Contributions to Overall Front End Phase Change with Temperature (With Kalmaljeet Saini and Dave Schmitt)

2006-03-07

Load Times on ALMA EDM

2006-01-27

Gain Stability Measurements for ALMA Band 6 Cartridge 002 (with Dave Schmitt)

2005-11-29

Leak Test Results For Band 7 300K Plate Measured by the NRAO

2005-10-12

GaAs LO Power Amplifier Measurements in Band 6 Cartridge

2005-10-05

Draft Requirements for Organizing “Rework” Jobs in Machine Shop

2005-07-26

Measured Parallelism of Band 6 Cartridge SN000 (Prototype Cartridge) (with Neil Horner)

2005-07-27

Leak Test Results for Band 6 Cartridge SN002 (with Neil Horner and Ralph Groves)

2005-05-20

Review of Band 6 Cartridge Measurement Data in RAL Cryostat and Cartridge Test Systems

2005-05-17

Comparison of Band 6 Cartridge Measurements in RAL Dewar and Cartridge Test Systems

2005-05-03

Leak Test Procedure for Waveguide Windows (with Neil Horner and Ralph Groves)

2005-04-13

Comparison of Measurements from Mixer and Cartridge Test Systems

2005-04-05

Mechanical Inspection of Mixer Blocks 101 to 120 (with Francoise Johnson)

2005-03-24

Leave Calendar Program Architecture and Design

2005-03-10

Mixer Noise Temperature Changes as Function of Mixer Physical Temperature (with Groves)

2005-03-03

Justification for Upgrading the JT-2 Measurement System to Test Wafers for Band 6 Mixers

2005-02-01

Comparison of Calculated and Measured Data for Mirrors used in ALMA Band 6 Cartridges (with Morris)

2005-01-26

Protection of Cryo-3 HFETs Used in the in ALMA Band 6 Cartridge

2004-10-15

Gain Stability Measurements of Band 6 Prototype Cartridge

2004-09-15

Measured Parallelism and Concentricity of Band 6 Cartridge (with Morris and Marshall)

2004-09-09

Chopper Upgrades (Lin Qiu Summer 2004)

2004-08-16

Problems with PLL Attenuators in Production LO

2004-05-21

Initial Measurements of Noise Power Density for an ALMA Band 6 Mixer-Preamp

2004-02-16

User's Guide and Software Design of Web-Based Task Tracking System

2004-01-28

Optimum Mixer Heater Resistor

2003-11-19

How and Why do Engineers Use Math (Lecture to 5th Grade Class)

2003-11-12

Programming LakeShore 218 Temperature Monitors with Calibration Data from DT-670 Sensors

2003-10-03

Gain Stability with No Cold InP Amps (with Lauria)

2003-09-26

Mixer Measurement Sequences

2003-09-05

Notes on Gain Stability Measurements of 13 Jun 2003

2003-08-22

Power Variation from Gain and Noise Temp Changes with Frequency for ALMA Band 6 Cartridge

2003-08-14

Recent Data for Saturation Measurements of Single-Ended SIS Mixer-Preamp for ALMA Band 6:
UVA10-03-L1362A-0403-2-HH-C14-L56-3-SIS375C-103-P14

2003-08-13

Development of a System to with Chopper Wheel and Fast Power Meter Measurements

2003-06-04

Unified Software Design for ALMA Front End Test Systems

2003-05-23

Kiwanis Talk: “The Central Development Lab and the and the National Radio Astronomy Observatory”

2003-05-20

Viewgraphs from IEEE Tour of Central Development Lab

2003-04-03

Saturation Measurements of Single-Ended SIS Mixer-Preamp for ALMA Band 6

2003-04-16

Software Specifications: ALMA Band 6 Cartridge Measurement System

2002-12-18

Gain vs. LO Power of SIS Mixer/Preamps for ALMA Band 6

2002-11-26

User’s Guide and Software Design of NTC’s Machine Shop Job Tracking System

2002-11-15

Database Design for Cartridge and Mixer Test Data

2002-10-17

Summer Student Final Report

2002-08-29

Proposed System to Track Effort Expended for ALMA Band 6 Cartridge Construction

2002-07-31

Database query to Retrieve Latest Excitation and Results Records

2002-05-17

Software Design for Automated LO

2002-04-15

Mixer/Preamp Interfaces for ALMA Band 6 Cartridge

2002-04-10

Cool-downs of JT-1 Dewar Compared to JT-2

2002-02-26

Isolated Level Control for the Automated LO System

2002-01-30

Measurement of Equivalent Noise Temperatures From Mixer Local Oscillators

2002-01-18

Measurement of WR-10 Quartz Windows Using Power Meter and Network Analyzer

2001-11-28

Stability Analysis of SIS Mixer Bias Supply with 1 K Ohm Isolation Resistors (also EDTN 189)

2001-11-20

NRAO HFET Amplifier Gain Compression Measured with Noise

2001-11-02

Initial Low Frequency Power Spectrum Measurements

2001-07-13

Comparison of Receiver Noise Temperatures Measured with Conical and Chopper-Based Loads

2001-06-29

JT-1 Initial Test Configuration

2001-06-26

Measurement of WR-10 Quartz Windows

2001-06-21

Measurement of SIS Mixer Type II Bias Supply Frequency Response

2001-05-03

Error Sensitivity for Noise Temperature Measurements

2001-05-01

LO Requirements for Automated Mixer Testing

2001-02-27

Production Test Dewar Interfaces for Balanced, Sideband Separating Mixers

2001-01-04

Reliability of Nanonics Dualobe Connectors

2001-01-03

Laboratory Measurements of Sideband Separating Mixer: UVaIX-L989A-A-10-0-L44-C22-BSSM371A-1

2000-12-04

Stability Analysis of SIS Mixer Bias Supply

2000-11-07

Recent Data Characterizing the SIS Noise Temperature Measurement System

2000-10-18

Software Design for Parameter Stepping

2000-09-01

Noise Temperatures Measured Manually and with Chopper Wheel

2000-07-28

Using Spectrum Analyzers as a Programmable Filter for Noise Temperature Measurements

2000-03-10

Square Law Detector Upgrades

2000-02-12

Cold Load Measurements (Excludes Figures)

2000-01-10

Bias Supply Hardware Design

1999-10-20

Coax Switch Controller, Refrigerator Controller, and Chopper Wheel Controller Design Document

1999-10-09

Software Design Slides (from Real-Time Software Conference)

1999-04-09

SIS Mixer Measurement Software Design Document

1998-09-03

 

 

 Photos

Title of Document

File Type

Initial Date

Revision Date

Mixer Test System

GIF 630K

2000-04-12

 

Mixer Test System Photo 2

GIF 640K

2000-04-12

 

Mixer Test System Photo 3

GIF 640K

2000-04-12

 

Mixer Test Lab

GIF 640K

2000-04-12

 

Lens, Mixer, and Coupler

GIF 629K

2000-04-12

 

Large Chopper Wheel and Supporting Cold Load

GIF 155K

2000-04-12

 

 

 

Data

Mixer Type

Description

Mixer ID Number

File Type

Measured Date

Single

Balanced

BSSM

Preamp

·

 

 

·

Measured Receiver Noise, Mixer/Preamp Gain, and LO Noise Temperature at Input

(Block test for new wafer)

UVAV-L568A-2-F5-C3-1-375C-101-M375P.05

pdf

2003-01-15

 

·

 

·

Measured Receiver Noise, Mixer/Preamp Gain, and LO Noise Temperature at Input (Internal NRAO Use)

(Capacitor value reduced)

Equipment Setup (Internal NRAO Use)

BBIA371-A-UVAVIII-L811B-1-0-C2-6-IF4-12P.02

pdf

2002-05-06

 

·

 

·

Measured Receiver Noise, Mixer/Preamp Gain, and LO Noise Temperature at Input (Internal NRAO Use)

(10 ohm resistor removed)

BBIA371-A-UVAVIII-L811B-1-0-C2-6-IF4-12P.02

pdf

2002-03-25

 

·

 

·

Measured Receiver Noise, Mixer/Preamp Gain, and LO Noise Temperature at Input (Internal NRAO Use)

(10 ohm resistor in bias line)

Equipment Setup (Internal NRAO Use)

BBIA371-A-UVAVIII-L811B-1-0-C2-6-IF4-12P.02

pdf

2002-03-14

 

·

 

·

Measured Receiver Noise, RF-LO Isolation, and LO Noise Temperature at Input (Internal NRAO Use)

UVaVIII-L811B-1-B2-3-GL-BM371-A+BM1F4-12P.01-A4

pdf

2002-01-15

 

 

·

 

Measured Receiver/Mixer Noise, Mixer Loss, Bias Currents (Internal NRAO Use)

UVaIX-L1165B-B-11-0-L44-C10-BSSM371-1

pdf

2001-11-30

 

 

·

 

Measured Receiver/Mixer Noise, Mixer Loss, Bias Currents (Internal NRAO Use)

UVaIX-L1165B-B-11-0-L53C14-BSSM371-1

pdf

2001-10-24

 

·

 

·

Measured Receiver/Mixer Noise, Mixer Loss, Bias Currents

UVaVIII-L811B-1-B2-7-GL-BM371-A+BM1F4-12P.01

html/pdf

2001-10-05

 

 

·

 

Measured Receiver/Mixer Noise, Mixer Loss, Bias Currents (Internal NRAO Use)

UVAIX-L996C-C-15-0-L44-C22-BSSM371A-01

pdf

2001-07-23

 

 

·

 

Measured Receiver/Mixer Noise, Image Rejection, Mixer Loss, Bias Currents (Internal NRAO Use)

UVaIX-L996C-D-16-0-L44-C22-BSSM371A-1

pdf

2001-03-22

 

 

·

 

Measured Receiver/Mixer Noise, Image Rejection, Mixer Loss, Bias Currents (Internal NRAO Use)

UVaIX-L996C-D-16-L62-C08-BSSM371A-1

pdf

2001-03-13

 

 

·

 

Measured Receiver/Mixer Noise, Image Rejection, Mixer Loss, Bias Currents (Internal NRAO Use)

UVaIX-L996C-C-15-L62-C10-BSSM371A-1

pdf

2001-03-05

·

 

 

·

Receiver Noise Temperature vs. LO Frequency

UVaV-L568A-2-F6-2-B3-371C-01 + Preamp: IF4-12(TRW)

GIF

2001-01-12

·

 

 

·

Receiver Noise Temperature vs. IF Frequency

UVaV-L568A-2-F6-2-B3-371C-01 + Preamp: IF4-12(TRW)

GIF

2001-01-12

 

 

·

 

Image Rejection vs. L-band IF Frequency

UVAIX-L996C-A-09-0-L44-C14-BSSM371A-1

GIF

2001-02-02

 

 

·

 

Receiver Noise Temperature vs. L-band IF Frequency

UVAIX-L996C-A-09-0-L44-C14-BSSM371A-1

GIF

2001-02-02

 

 

·

 

Comparison of Image Rejection Using Conventional and Kerr's Method

UVAIX-L989A-A-10-0-L44-C22-BSSM371A-1

GIF

2000-12-12